About the Candidate
ABDUL WALI
Mechanical Engineer
Address: Turaif, Saudi Arabia
Email Id: walipitafi@gmail.com
Cell No: +966-554303325
Summary: I have in-depth expertise in commissioning, accumulated from over 17 years of experience in Power Generation projects. I spent over 11 years on commissioning CCGT Equipment’s (Steam Turbines, HRSG, Gas Turbines, BOP) and pipelines. As commissioning engineer, I have managed commissioning and developed packages operating procedures in-line with the client’s standards. I have a degree in Mechanical Engineering, started my career as a construction & commissioning engineer.
Qualification:
B.E MECHANICAL
QUAID-E-AWAM UNIVERSITYOF ENGG.SCIENCES & TECHNOLOGY, NAWABSHAH DEC 2004
Professional Affiliation:
Member of Pakistan Engineering Council PEC (MECH/24789)
Member of Saudi Council of Engineers Membership No. 185490
EXPERIENCE:
1. Project Name: TANAJIB IPP COGEN POWER PLANT 934 MW, Saudi Arabia
Mechanical/Commissioning Supervisor for GTG/STG Nov-2023 to date
Plant details:
GT Frame 7FA.05 (by GE) 3 X 234 MW, Steam Turbine (Skoda) 2 X 116 MW, 03 X HRSG, 02 X Air Cooled Condenser
Responsible for Construction/Commissioning Activities
* GTG/STG with piping and all accessories installation and commissioning.
* ITP and Commissioning procedure review and finalized.
* Daily/Weekly and Monthly report preparation.
* GTG/STG ITPs and Method of Statement review and finalized.
* GT On base and Off base piping air blowing and cleaning.
* GT Lube oil flushing as per approved Method of statement.
* GT Pre alignment and final alignment inspection.
* Lube oil, Hydraulic oil, sealing, jacking oil pumps and water wash skid pumps load test.
* Cooling water line chemical cleaning.
* GT Cooling and Ventilation systems commissioning.
* GT, Accessary and Load compartment integrity test.
* STG and its accessories installation and commissioning.
* STG Lube oil flushing as per approved Method of statement.
* STG Piping installation inspection.
* Steam pipe spools after control valve hydrolyzing.
* CO2 purging and H2 filling of Hydrogen cooled Generator.
* BOP Equipment and Its piping installation such as CCW, Air Compressor, Water Treatment Plant, Potable, Service Water Pumps, Bulk Chemical and Chemical dosing.
* Fire Fighting Pump house, Sprinkler system, FM200 system, Fire Hydrant and Fire water network piping installation and commissioning.
* HVAC system installation, PACU, VRF System and its tubing and HVAC ducting system installation and commissioning.
2. Project Name: WAAD AL SHAMAL INTEGRATED SOLAR COMBINED CYCLE POWER PLANT 1400 MW, Saudi Arabia
Mechanical Commissioning Engineer with ESB INTERNATIONAL – Ireland December-2017 to Nov 2023
Plant details:
GT Frame 7FA.5 (by GE) 4 X 230 MW, Steam Turbine D604 (by GE) 1 X 480 MW, 04 X HRSG, 01 X Air Cooled Condenser, 05 X Gas Compressor (by GE).
Responsible for Construction/Commissioning Activities
* Heavy duty Gas turbines and Steam turbine Multi shaft with all accessories commissioning.
* Commissioning ITPs & Method of Statements finalized with client.
* HRSG and condensate piping chemical cleaning.
* HRSG and HP, HRH and LP piping steam blowing.
* Steam pipe spools after control valve hydrolyzing.
* CO2 purging and H2 filling of Hydrogen cooled Generator.
* Commissioning procedures review and finalized.
* Actively participate in Test on Completion activities.
* Air cooled condenser with affiliated system commissioning.
* Gas compressors (Multistage high pressure intercooled) commissioning.
* GTs, STG and Gas compressors lube oil flushing meeting ISO standards.
* Gas compressors load test covering functional checks.
* GTs Fuel oil system, ACW system & water injection system flushing.
* Gas piping leak test from tie in point to plant (16.5 Km Gas pipe line).
* HRSG Safety valves Trevi Test
3. Project Name: AL QASSIM COMBINE CYCLE POWER PLANT 1116 MW, Saudi Arabia
Mechanical Commissioning Engineer with B&V (Black & Veatch) March 2015 to December-2017
Plant details:
GT Frame 7E 12 X 59 MW, Steam Turbine 3 X 136 MW, 12 X HRSG and 3 X Air Cooled Condenser
Responsible for Construction/Commissioning Activities
* Commissioning ITPs and Method of statement finalized.
* Commissioning procedure review and send to client for approval.
* Test on Completion activities.
* HRSG, Steam Turbine with all Auxiliaries, Feed Water Tanks & Deaerators Boiler Feed Water Pump, Condensate Extraction Pump, Air Cooled Condenser, Hogging and Holding Pumps, Air Compressor, Closed Cooling Water Pumps & Fin Fan Coolers, Diverter Damper, Bulk Chemical System, Tanks, HVAC and Water Treatment Plant commissioning.
* Alignment Checks & witness for STG, BFP, CEP, Hogging and Holding Pumps and Miscellaneous Pumps in Water Treatment according to the API 686 and as per specification.
* Fire Fighting System testing & commissioning.
* Hydro/Pneumatic Test of HRSG/ASME Piping, GTG Piping, STG Piping, HP & LP Piping, Condensate, CCW, Air Cooled Condenser Piping, other BOP piping and Leak Test of Air Cooled Condenser
* Air Blowing, Lube Oil Flushing, GT Water washing, HRSG’s Chemical Cleaning, HRSG Preservation, Hydro Milling of Auxiliary Steam & Extraction Steam Piping, Steam Blowing, CCW Piping Flushing and Tank’s Hydro Jetting
* Solo Run Test for various type of pumps to check & witness alignment, Vibration, Temperature and Noise Level of BFP, CEP, Hogging and Holding Pumps Drain Pumps
* Safety valves Trevi-test
* Design Review and Daily Activity Monitoring as per Schedule
* First Crank Test, False Fire, First Fire and Loss of Flame Trip test
* First FSNL, Speed Limitations and Over Speed Trip Test
* First Synchronization, First Loading and Steady Data Collection
* Base Load Test, Performance Test& Reliability Run Test
4. Project Name: TIHAMA COGENERATION POWER PLANT (GDF SUEZ) 180 MW
Mechanical Commissioning Engineer with Tractebel (GDF – SUEZ) March 2014 to March 2015
Plant details:
GT Frame 7FA 1 X 180 MW and 1 X HRSG Single Pressure
Shedgum Gas Plant Saudi Aramco.
Responsible for Commissioning Activities
* Design Review and Daily Activity Monitoring as per Schedule
* GTG, HRSG with all Auxiliaries, Closed Cooling water & Fin Fan Cooler, Heating Boosting Pumps, TIAC Chillers, HVAC, Fire Fighting System, Fuel Gas Separator, Scrubber and Heater and Pipe Rack Inspection
* Alignment of Gas Turbine, CCW Pump, Waste Water Pump, Chemical Dosing Pump and Heating Booster Pump
* Hydro/Pneumatic Test Inspection of HRSG/ASME piping, GTG piping and BOP piping
* Air Blowing, GT Water Washing, HRSG chemical cleaning and HRSG preservation, CCW, Makeup Water, Utility Water and Potable Water line Flushing
* First Crank Test, False Fire, First Fire and Loss of Flame Trip test
* First FSNL, Speed Limitations and Over Speed Trip Test
* First Synchronization, First Loading and Steady Data Collection
* Base Load Test, Performance Test& Reliability Run Test
5. Project Name: UCH COMBINE CYCLE POWER PLANT (GDF SUEZ) 375 MW, Pakistan
Lead Mechanical Engineer with Hyundai Engineering and Construction June 2012 to March 2014
Plant details:
GDF SUEZ (GT Frame 9E 2 X 128 MW, Steam Turbine 1 X 133 MW, 2 X HRSG and 1 X Water Cooled Condenser)
Responsible for Erection & Commissioning Activities
* Gas Turbine, Steam Turbine with all Auxiliaries, Water Cooled Condenser, Boiler Feed Water Pump, Condensate Extraction pump, CCW & Main Cooling Water Pump and BOP installation inspection
* Generator Stator and bearing pedestal installation, Rotor insertion and bearing assembly
* T/G Coupling alignment, Reaming and bolt tightening
* GTG and STG Piping Lube Oil Flushing, Air Intake Systems, Off Line Water Washing, Cooling Water and HSD (High Speed Diesel) Lines Flushing and Piping air blowing and N2 purging of Gas Piping.
* IGV blade angle checked and calibrating
* Hydraulic Accumulator, Fuel Oil Filter Accumulator and Gas Compartment Accumulator N2 filling
* Checked all equipment and Piping according GE documents and RFR (Red Flag Review) with GE T/A
* Functional Test before First Firing
* First Crank Test, False Fire, First Fire and Loss of Flame Trip test
* First FSNL, Speed Limitations and Over Speed Trip Test
* First Synchronization, First Loading and Steady Data Collection
* Fuel Transfer Test (Liquid Fuel to Gas Fuel)
* Base Load Test, Performance Test
6. Project Name: FOUNDATION COMBINE CYCLE POWER PLANT DAHARKI MW-175, Pakistan
Mechanical Engineer with Siemens Pakistan January 2009 to January 2012
Plant details:
GT Frame 9E 1 X 121 MW, Steam Turbine 1 X 64 MW and Water-Cooled Condenser
Warranty Period Activities
* GT Overhauling and 1st CI (Combustion inspection).
* Replacement of GT Atomizing Air Cooler, Air inlet Filters and GT off line washing.
* HRSG (Heat recovery steam generator) LP super heater area support modification HRSG (Heat recovery steam generator) LP super heater area tube plugged as BPVC 2010.
* HRSG (Heat recovery steam generator) Hot spot rectification.
* Control valves repairing and safety valves lapping &Trevi-test
* Steam Turbine SJAE (Steam Jet Air Ejector) over hauling & Magnetic Test for leakage trace & rectification
* Supervision of HRSG Steam Blow and witness target fixed.
* Preparation of punch list and Raising of Surveillance Reports & NCRs due to nonconformance of specification requirements by contractor.
Erection & Commissioning Activities
* GTG, Air Intake System and Auxiliaries installation inspection
* Fabrication and installation of Piping as per ASME B31.1
* GTG alignments (Gas Turbine to Generator and Gas Turbine to Auxiliary compartment).
* Gas Turbine, Accessory compartment and Auxiliary skids (Fuel oil forwarding skid, Fuel oil heater skid, Fuel oil filtering skid, APU system, Water Injection Skid, Gas Module skid and Gas filtering skid) commissioned according to P&ID
* Lube Oil Flushing, Air Intake Systems inspection, Cool Water and HSD (High Speed Diesel) Lines Flushing, piping air blowing and N2 purging of Gas Piping.
* IGV blade angle checked and calibrating
* Hydraulic Accumulator, Fuel Oil Filter Accumulator and Gas Compartment Accumulator N2 filling
* Checked all equipment and Piping according GE documents and RFR (Red Flag Review) with GE T/A
* Functional Test before First Firing
* Off Line Water Washing
* First Crank Test, False Fire, First Fire and Loss of Flame Trip test
* First FSNL, Speed Limitations and Over Speed Trip Test
* First Synchronization, First Loading and Steady Data Collection
* Fuel Transfer Test (Liquid Fuel to Gas Fuel)
* Base Load Test, Performance Test
7. Project Name: DHA COGEN COMBINE CYCLE POWER PLANT 94 MW, Pakistan
Mechanical Engineer with Siemens Pakistan April 2007 to December 2008
Plant details:
GT V64.3A 64 MW, Steam Turbine 30 MW and HRSG.
Responsible for Erection & Commissioning Activities
* Installation and commissioning of Gas Turbine (V64.3A) and Accessories.
* Installation of Air intake filters assembly and structure.
* Alignment (GT to accessory compartment and GT to Generator)
* Fabrication, erection, pressure testing and flushing of piping.
Project Name: BHIT GAS FIELD PLANT DADU, Pakistan
Mechanical Engineer with Siemens Pakistan – February 2005 to March 2007
Responsible for Erection Activities
* Erection, Commissioning and Startup of rotary equipment
* Checking/tracking the shop drawings, material submittal, method statements, variation to contract works, as built drawing and technical submissions.
* Co-coordinating the MEP works with civil works in an efficient manner to ensure smooth work progress
* Supervising Quality controls in coordination with the QA/QC Engineers
* Approaching Local Authorities for NOC/Inspection approvals.
* Alignment of pumps and fans.
* Facilities servicing (pumps, valves, fans and piping)
COMPUTER SKILLS
* Expert user of MS Office & Utilities
* MS Project
*Engineering Software’s
PERSONEL DETAIL
Father Name : Ashraf Ali
Date of Birth : 15-April-1978
Marital Status : Married
Nationality : Pakistani
Passport : AA3482832
NIC No. : 45104-2306283-5
Iqama. : Valid Transferable
ABDUL WALI
Mechanical Engineer
Address: Turaif, Saudi Arabia
Email Id: walipitafi@gmail.com
Cell No: +966-554303325
Summary: I have in-depth expertise in commissioning, accumulated from over 17 years of experience in Power Generation projects. I spent over 11 years on commissioning CCGT Equipment’s (Steam Turbines, HRSG, Gas Turbines, BOP) and pipelines. As commissioning engineer, I have managed commissioning and developed packages operating procedures in-line with the client’s standards. I have a degree in Mechanical Engineering, started my career as a construction & commissioning engineer.
Qualification:
B.E MECHANICAL
QUAID-E-AWAM UNIVERSITYOF ENGG.SCIENCES & TECHNOLOGY, NAWABSHAH DEC 2004
Professional Affiliation:
Member of Pakistan Engineering Council PEC (MECH/24789)
Member of Saudi Council of Engineers Membership No. 185490
EXPERIENCE:
1. Project Name: TANAJIB IPP COGEN POWER PLANT 934 MW, Saudi Arabia
Mechanical/Commissioning Supervisor for GTG/STG Nov-2023 to date
Plant details:
GT Frame 7FA.05 (by GE) 3 X 234 MW, Steam Turbine (Skoda) 2 X 116 MW, 03 X HRSG, 02 X Air Cooled Condenser
Responsible for Construction/Commissioning Activities
* GTG/STG with piping and all accessories installation and commissioning.
* ITP and Commissioning procedure review and finalized.
* Daily/Weekly and Monthly report preparation.
* GTG/STG ITPs and Method of Statement review and finalized.
* GT On base and Off base piping air blowing and cleaning.
* GT Lube oil flushing as per approved Method of statement.
* GT Pre alignment and final alignment inspection.
* Lube oil, Hydraulic oil, sealing, jacking oil pumps and water wash skid pumps load test.
* Cooling water line chemical cleaning.
* GT Cooling and Ventilation systems commissioning.
* GT, Accessary and Load compartment integrity test.
* STG and its accessories installation and commissioning.
* STG Lube oil flushing as per approved Method of statement.
* STG Piping installation inspection.
* Steam pipe spools after control valve hydrolyzing.
* CO2 purging and H2 filling of Hydrogen cooled Generator.
* BOP Equipment and Its piping installation such as CCW, Air Compressor, Water Treatment Plant, Potable, Service Water Pumps, Bulk Chemical and Chemical dosing.
* Fire Fighting Pump house, Sprinkler system, FM200 system, Fire Hydrant and Fire water network piping installation and commissioning.
* HVAC system installation, PACU, VRF System and its tubing and HVAC ducting system installation and commissioning.
2. Project Name: WAAD AL SHAMAL INTEGRATED SOLAR COMBINED CYCLE POWER PLANT 1400 MW, Saudi Arabia
Mechanical Commissioning Engineer with ESB INTERNATIONAL – Ireland December-2017 to Nov 2023
Plant details:
GT Frame 7FA.5 (by GE) 4 X 230 MW, Steam Turbine D604 (by GE) 1 X 480 MW, 04 X HRSG, 01 X Air Cooled Condenser, 05 X Gas Compressor (by GE).
Responsible for Construction/Commissioning Activities
* Heavy duty Gas turbines and Steam turbine Multi shaft with all accessories commissioning.
* Commissioning ITPs & Method of Statements finalized with client.
* HRSG and condensate piping chemical cleaning.
* HRSG and HP, HRH and LP piping steam blowing.
* Steam pipe spools after control valve hydrolyzing.
* CO2 purging and H2 filling of Hydrogen cooled Generator.
* Commissioning procedures review and finalized.
* Actively participate in Test on Completion activities.
* Air cooled condenser with affiliated system commissioning.
* Gas compressors (Multistage high pressure intercooled) commissioning.
* GTs, STG and Gas compressors lube oil flushing meeting ISO standards.
* Gas compressors load test covering functional checks.
* GTs Fuel oil system, ACW system & water injection system flushing.
* Gas piping leak test from tie in point to plant (16.5 Km Gas pipe line).
* HRSG Safety valves Trevi Test
3. Project Name: AL QASSIM COMBINE CYCLE POWER PLANT 1116 MW, Saudi Arabia
Mechanical Commissioning Engineer with B&V (Black & Veatch) March 2015 to December-2017
Plant details:
GT Frame 7E 12 X 59 MW, Steam Turbine 3 X 136 MW, 12 X HRSG and 3 X Air Cooled Condenser
Responsible for Construction/Commissioning Activities
* Commissioning ITPs and Method of statement finalized.
* Commissioning procedure review and send to client for approval.
* Test on Completion activities.
* HRSG, Steam Turbine with all Auxiliaries, Feed Water Tanks & Deaerators Boiler Feed Water Pump, Condensate Extraction Pump, Air Cooled Condenser, Hogging and Holding Pumps, Air Compressor, Closed Cooling Water Pumps & Fin Fan Coolers, Diverter Damper, Bulk Chemical System, Tanks, HVAC and Water Treatment Plant commissioning.
* Alignment Checks & witness for STG, BFP, CEP, Hogging and Holding Pumps and Miscellaneous Pumps in Water Treatment according to the API 686 and as per specification.
* Fire Fighting System testing & commissioning.
* Hydro/Pneumatic Test of HRSG/ASME Piping, GTG Piping, STG Piping, HP & LP Piping, Condensate, CCW, Air Cooled Condenser Piping, other BOP piping and Leak Test of Air Cooled Condenser
* Air Blowing, Lube Oil Flushing, GT Water washing, HRSG’s Chemical Cleaning, HRSG Preservation, Hydro Milling of Auxiliary Steam & Extraction Steam Piping, Steam Blowing, CCW Piping Flushing and Tank’s Hydro Jetting
* Solo Run Test for various type of pumps to check & witness alignment, Vibration, Temperature and Noise Level of BFP, CEP, Hogging and Holding Pumps Drain Pumps
* Safety valves Trevi-test
* Design Review and Daily Activity Monitoring as per Schedule
* First Crank Test, False Fire, First Fire and Loss of Flame Trip test
* First FSNL, Speed Limitations and Over Speed Trip Test
* First Synchronization, First Loading and Steady Data Collection
* Base Load Test, Performance Test& Reliability Run Test
4. Project Name: TIHAMA COGENERATION POWER PLANT (GDF SUEZ) 180 MW
Mechanical Commissioning Engineer with Tractebel (GDF – SUEZ) March 2014 to March 2015
Plant details:
GT Frame 7FA 1 X 180 MW and 1 X HRSG Single Pressure
Shedgum Gas Plant Saudi Aramco.
Responsible for Commissioning Activities
* Design Review and Daily Activity Monitoring as per Schedule
* GTG, HRSG with all Auxiliaries, Closed Cooling water & Fin Fan Cooler, Heating Boosting Pumps, TIAC Chillers, HVAC, Fire Fighting System, Fuel Gas Separator, Scrubber and Heater and Pipe Rack Inspection
* Alignment of Gas Turbine, CCW Pump, Waste Water Pump, Chemical Dosing Pump and Heating Booster Pump
* Hydro/Pneumatic Test Inspection of HRSG/ASME piping, GTG piping and BOP piping
* Air Blowing, GT Water Washing, HRSG chemical cleaning and HRSG preservation, CCW, Makeup Water, Utility Water and Potable Water line Flushing
* First Crank Test, False Fire, First Fire and Loss of Flame Trip test
* First FSNL, Speed Limitations and Over Speed Trip Test
* First Synchronization, First Loading and Steady Data Collection
* Base Load Test, Performance Test& Reliability Run Test
5. Project Name: UCH COMBINE CYCLE POWER PLANT (GDF SUEZ) 375 MW, Pakistan
Lead Mechanical Engineer with Hyundai Engineering and Construction June 2012 to March 2014
Plant details:
GDF SUEZ (GT Frame 9E 2 X 128 MW, Steam Turbine 1 X 133 MW, 2 X HRSG and 1 X Water Cooled Condenser)
Responsible for Erection & Commissioning Activities
* Gas Turbine, Steam Turbine with all Auxiliaries, Water Cooled Condenser, Boiler Feed Water Pump, Condensate Extraction pump, CCW & Main Cooling Water Pump and BOP installation inspection
* Generator Stator and bearing pedestal installation, Rotor insertion and bearing assembly
* T/G Coupling alignment, Reaming and bolt tightening
* GTG and STG Piping Lube Oil Flushing, Air Intake Systems, Off Line Water Washing, Cooling Water and HSD (High Speed Diesel) Lines Flushing and Piping air blowing and N2 purging of Gas Piping.
* IGV blade angle checked and calibrating
* Hydraulic Accumulator, Fuel Oil Filter Accumulator and Gas Compartment Accumulator N2 filling
* Checked all equipment and Piping according GE documents and RFR (Red Flag Review) with GE T/A
* Functional Test before First Firing
* First Crank Test, False Fire, First Fire and Loss of Flame Trip test
* First FSNL, Speed Limitations and Over Speed Trip Test
* First Synchronization, First Loading and Steady Data Collection
* Fuel Transfer Test (Liquid Fuel to Gas Fuel)
* Base Load Test, Performance Test
6. Project Name: FOUNDATION COMBINE CYCLE POWER PLANT DAHARKI MW-175, Pakistan
Mechanical Engineer with Siemens Pakistan January 2009 to January 2012
Plant details:
GT Frame 9E 1 X 121 MW, Steam Turbine 1 X 64 MW and Water-Cooled Condenser
Warranty Period Activities
* GT Overhauling and 1st CI (Combustion inspection).
* Replacement of GT Atomizing Air Cooler, Air inlet Filters and GT off line washing.
* HRSG (Heat recovery steam generator) LP super heater area support modification HRSG (Heat recovery steam generator) LP super heater area tube plugged as BPVC 2010.
* HRSG (Heat recovery steam generator) Hot spot rectification.
* Control valves repairing and safety valves lapping &Trevi-test
* Steam Turbine SJAE (Steam Jet Air Ejector) over hauling & Magnetic Test for leakage trace & rectification
* Supervision of HRSG Steam Blow and witness target fixed.
* Preparation of punch list and Raising of Surveillance Reports & NCRs due to nonconformance of specification requirements by contractor.
Erection & Commissioning Activities
* GTG, Air Intake System and Auxiliaries installation inspection
* Fabrication and installation of Piping as per ASME B31.1
* GTG alignments (Gas Turbine to Generator and Gas Turbine to Auxiliary compartment).
* Gas Turbine, Accessory compartment and Auxiliary skids (Fuel oil forwarding skid, Fuel oil heater skid, Fuel oil filtering skid, APU system, Water Injection Skid, Gas Module skid and Gas filtering skid) commissioned according to P&ID
* Lube Oil Flushing, Air Intake Systems inspection, Cool Water and HSD (High Speed Diesel) Lines Flushing, piping air blowing and N2 purging of Gas Piping.
* IGV blade angle checked and calibrating
* Hydraulic Accumulator, Fuel Oil Filter Accumulator and Gas Compartment Accumulator N2 filling
* Checked all equipment and Piping according GE documents and RFR (Red Flag Review) with GE T/A
* Functional Test before First Firing
* Off Line Water Washing
* First Crank Test, False Fire, First Fire and Loss of Flame Trip test
* First FSNL, Speed Limitations and Over Speed Trip Test
* First Synchronization, First Loading and Steady Data Collection
* Fuel Transfer Test (Liquid Fuel to Gas Fuel)
* Base Load Test, Performance Test
7. Project Name: DHA COGEN COMBINE CYCLE POWER PLANT 94 MW, Pakistan
Mechanical Engineer with Siemens Pakistan April 2007 to December 2008
Plant details:
GT V64.3A 64 MW, Steam Turbine 30 MW and HRSG.
Responsible for Erection & Commissioning Activities
* Installation and commissioning of Gas Turbine (V64.3A) and Accessories.
* Installation of Air intake filters assembly and structure.
* Alignment (GT to accessory compartment and GT to Generator)
* Fabrication, erection, pressure testing and flushing of piping.
Project Name: BHIT GAS FIELD PLANT DADU, Pakistan
Mechanical Engineer with Siemens Pakistan – February 2005 to March 2007
Responsible for Erection Activities
* Erection, Commissioning and Startup of rotary equipment
* Checking/tracking the shop drawings, material submittal, method statements, variation to contract works, as built drawing and technical submissions.
* Co-coordinating the MEP works with civil works in an efficient manner to ensure smooth work progress
* Supervising Quality controls in coordination with the QA/QC Engineers
* Approaching Local Authorities for NOC/Inspection approvals.
* Alignment of pumps and fans.
* Facilities servicing (pumps, valves, fans and piping)
COMPUTER SKILLS
* Expert user of MS Office & Utilities
* MS Project
*Engineering Software’s
PERSONEL DETAIL
Father Name : Ashraf Ali
Date of Birth : 15-April-1978
Marital Status : Married
Nationality : Pakistani
Passport : AA3482832
NIC No. : 45104-2306283-5
Iqama. : Valid Transferable
Share
Facebook
X
LinkedIn
Telegram
Tumblr
Whatsapp
VK
Mail