Seeking a job opportunity in the field of project management. I have done my master’s degree in management science with a specialization in project management and B-Tech Mechanical Engineering Technology and have 11 years of experience in the fields of steel fabrication, site erections, and installation work experience like pressure vessels, heat exchangers, piping, steel structures, wind towers, sugar mills, steel mills, cement plants, barrage gates, tank civil construction, Machining & Weld Overlay Cladding, spectacle blind /pipe sleeve, and storage tanks of experiences. I am trying to enhance my education and knowledge by participating in a group work environment that has space to allow continuous self-motivation and development.

Education

Jan-2013 / Sep-2017
Indus University, Karachi Pakistan Bachelor of Technology Mechanical
Sep-2018 / Feb-2021
Muhammad Ali Jinnah University, Karachi Pakistan MS in Project Management

Experience

JUL 2014 to JAN-2018
DESCON ENGINEERING LIMITED (KMW), KARACHI, PAKISTAN Production Planning & Control Coordinator

1. Coordination and reporting to the Planning Department to execute activity as per the provided plan.
2. The project plan establishes the scope, aims, objectives, and method that will be used for the project, as well as the way in which the project activities will be performed, the roles and responsibilities of those involved.
3. Coordinate and manage project work & Monitor project progress and performance, Prepare progress, final and other reports and production planning issues.
4. Plan and manage production Schedules to ensure 100% on-time Dispatch of all Projects.
5. Coordination and reporting to the Planning Department to execute activity as per the provided Plan.
6. Weekly & Monthly Production Progress and Productivity reports.
7. Maintains the production schedule and other reports as required.
8. Complete status reports for production progress, work in process, and raw material inventory.
Projects in Descon Engineering Limited: –
1. Agha Steel Mill: – Fabrication & Supply, Erection & commissioning of Conveyor Structure Scrape Buckets, Piping, Ducts in 2017.
2. DG CEMENT: – Fabrication & Supply, Erection & commissioning of Kiln Shells & Hopper Liner in 2016.
3. Procter & Gamble Pakistan: – Fabrication & Supply of Water Storage Tank 1500m3 in 2016.
4. SEPCO: – Fabrication & Supply of Coal Bunker (Qty. = 06) in 2016.
5. NESTLE Pakistan: – Fabrication & Erection Repair of Tube Bundle of Ammonia Condenser in 2016.
6. BYCO Oil Pakistan Limited: – Fabrication & Supply of “U” Tube Bundles (Qty. =12) in 2016.
7. Engro Polymer & Chemical Limited: – Fabrication & Supply of Re-Tubing of Heat Exchanger in 2015.
8. Procter & Gamble Pakistan: – Fabrication, Erection & commissioning of wastewater Treatment Plant Aerations Tank, Buffer Tanks, Mixing Tanks, and Structure with Platform in 2015.
9. Yunus Energy Limited: – Fabrication, Erection & commissioning of Wind Tower Quantity = 20 in 2015.
10. Metro Energy Limited: – Fabrication, Erection & commissioning of Wind Tower Quantity = 20 in 2015.
11. Gul-Ahmed Energy Limited: – Fabrication, Erection & commissioning of Wind Tower Quantity = 20 in 2015.
12. K-Electric Project: – Fabrication, Erection & commissioning of KGTPS & SGTPS Expansion Piping, Pipe Supports, Deaerator & Condensate Vessel, Dampers, Deaerator & Boiler Structure in 2014.
13. Engro Polymer & Chemical: – Fabrication, Erection & commissioning of HCL Storage Vessel, LPG Storage Vessel, Heat Exchangers in 2014.

FEB 2018 to NOV-2019
ABS ENGINEERING CORPORATION (PVT.) LIMITED, KARACHI, PAKISTAN Planning Engineer

1. Prepares the Monthly Labor Histograms.
2. Plans, organizes, and coordinates planning activities.
3. Prepares the Monthly, Weekly & Daily Progress Reports.
4. Prepares cash flow, charts and histograms for planning projects.
5. Awareness of Earned Value concepts for long term projects and construction activities.
6. Preparing monthly MIS reports for projects / Management reporting presentations etc.
7. Attend regular project review meeting and follow-up with respective departments for pending actions.
8. Participate in all meetings (i.e. schedule review meeting, progress meeting, coordination meeting, and so on).
9. Highlighting issues and delays with respect to base line and prepare management reports and catch-up plans.
10. Monitor and rectify the variance in planning & execution of schedules & coordinating with team leaders and estimators for implementing / revising schedules.
Projects in ABS Engineering Corporation (Pvt.) Limited: –
1. Pakistan Molasses Company (Pvt.) Limited: – Construction, Fabrication, Supply, Erection & Commissioning of 06 Nos. Storage Tank & Civil Foundation in 2020.
2. Engro Polymer & Chemicals Limited: – Fabrication, Supply, Erection & Commissioning of Wastewater Steam Stripper AS-801 in 2019.
3. Engro Polymer & Chemicals Limited: – Construction, Fabrication, Supply & Commissioning of EDC Storage Tank Cap.: 5000 M. Tons, Dia.: 21m, Height: 15m in 2019.
4. Madina Sugar Mills (Private) Limited: – Fabrication & Commissioning of Equipment (Alcohol & Fermentation) for distillery project in 2018.
5. Ramzan Sugar Mills (Private) Limited: – Fabrication & Commissioning of Equipment (Alcohol, Anhydrous & Fermentation) for distillery project in 2018.
6. Unicol: – Fabrication & Commissioning of Fermenter Tank R-1430 in 2018.

DEC 2019 to OCT 2021
A. KARIM & SONS ENGINEERING PRIVATE LIMITED, KARACHI, PAKISTAN Planning Engineer

1. Develop and update resource histogram monthly or as required.
2. Supervises contractor’s work at site and monitors physical progress of work.
3. Monitors Contractor’s project plans, schedules, progress, resource utilization etc.
4. Deciding on proper engineering techniques and milestone sequences for each project stage.
5. Managing overall project communications is a critical part of them successfully completing.
6. Monitor day-to-day work progress for a project and provide accurate weekly and monthly reports.
7. Monitoring and tracking project progress and writing up reports and scheduling meetings as required.
8. Determines critical-path activities for assigned discipline or specialties and identifies significant activities.
9. Monitors progress periodically and compares it with the baseline planning, prepares the fortnightly Progress reports.
Projects in A Karim & Sons Engineering (Pvt.) Ltd.
1. Fabrication and As-Built Drawings for Rehabilitation of Vertical Storage Tanks Nos.3: – Prepare an As Built and fabrication drawings for Rehabilitation of Vertical Storage Tanks, Steel Structure Platform, Piping, & Civil drawings tanks Nos.3 at (Pakistan State Oil) KTB.
2. Rehabilitation of Vertical Storage Tanks at (Pakistan State Oil) KTB: – Integrity of tanks, Mechanical repair works, piping works, Sand blasting & painting in Sep-2019 to Feb-2022 Nos.7.
3. Supply and Installation of Pig Receiver 20-inch Dia. at (Pakistan State Oil) KTB: – Designing, Fabrication & Commissioning of Equipment 20″dia Pig receiver, Civil Foundation Works, Pipeline 20” & Painting Works in Oct-2020 to Feb-2021.
4. Rehabilitation of Vertical Diesel Storage Tanks For 248MW (K-Electric) KPC: – Integrity of tanks, Mechanical repair works, piping works, Sand blasting & painting, 30m Dia., 12m Height (Nov-2020 to Feb-2021 Nos. 03).
5. Shutdown – Major Repair Works in Tank # 303 at (Pakistan State Oil) KTB: – Integrity of tanks, Mechanical repair works, piping works, Sand blasting & painting, 24.4m Dia., 14.6m Height (Nov- 2019 to Dec-2019 Nos. 01).

NOV 2021 to DEC 2022
KARACHI SHIPYARD & ENGINEERING WORKS LIMITED, KARACHI, PAKISTAN Assistant Manager

1. Plan and coordinate construction activities daily.
2. Recommend cost reduction initiatives while maintaining quality and productivity.
3. Planning and coordinating all installations and refurbishments.
4. Identify slippages or delays in construction and adjust schedules to meet deadlines.
5. Identify milestones and problem areas and accordingly recommend preventive actions.
6. Planning & Cost Estimation of Engineering related Projects.
7. Preparing Master and Milestone Construction Schedule.
8. To understand project specifications and developing time schedules that meet them.
9. Attending and scheduling meetings as required.
10. Ensuring all projects are completed on time and within budgets.

Projects in Karachi Shipyard & Engineering Works Limited
1. Sukkur Barrage Gate (Sindh Barrages Irrigation Department: – Replacement, Fabrication, Supply, Erection & Commissioning of Sukkur Barrage Gate Nos.6 in 2020 to 2022.
2. Keel Block Structure (SLTS): – Fabrication, Supply & Commissioning of Nos.22 in 2021 to 2022.
3. Docking Arrangement of Alamghir (SLTS): – Fabrication, Supply & Commissioning of (Keel Beam 12m, Keel Beam 8m, Intermediate platforms, Hose Connector 12m & Bracing Bar 12m in 2021 to 2022.
4. Side Block Structure (SLTS): – Fabrication, Supply & Comm. of Nos.56 in 2021 to 2022.
5. Trestle for ship lift system (SLTS): – Fabrication, Supply & Comm. of Nos.56 in 2021 to 2022.

JAN 2023 to JAN 2025
SALAMA ENGINEERING INDUSTRIES, DAMMAM, K.S.A. Project Engineer

1. Responsible for ensuring that engineering deliverables are as per project specification.
2. Developed Manpower Histogram, Plan S Curves, Look ahead Schedules and Progress Reports.
3. Responsible for Planning, execution, progress monitoring, resource estimation and Report Preparation using Primavera P6, MS Project and Excel.
4. Develop Project budget in primavera and cash flow based on plan progress of the project.
5. Responsible for coordinating with the procurement department to ensure that quotations are received, that they are technically acceptable, that POs are placed, and that materials are delivered on time using (Microsoft Dynamics ERP).
6. Responsible for Site materials as per requirement and Monitoring Site team and managing all resources to get better results for work.
7. Assign duration, resources (Manpower, Materials and Equipment’s) and Budgeted Cost for each activity based on their weight factor & quantity/volume of work and identify Long Lead items required in the Project.
8. Analyze drawings, specifications & method statements of works for the preparation of activity networks / scheduling/resources planning and allocation.
9. Track, monitor and forecast progress of all activities and deliverables, engineering documents, fabrication status of production/sites of all discipline.
Projects in Salama Engineering Industries, Dammam, K.S.A.
1. MA’ADEN BAUXITE AND ALUMINA COMPANY: Fabrication and Supply 2 Hex Assembly ASME “U” Stamp & Gas Scrubber Nos.1.
2. HAYAWY INDUSTRIES CO. FACTORY: Fabrication and Supply 21 tanks with Structure Ladder, Railing and Platforms.
3. SAHARA INTERNATIONAL PETROCHEMICAL (SIPCHEM): Replacement of internal Coil for Receiver Drum Nos.1 &
4. SABIC-PETROKEMIYA: Design, Fabrication, Supply of RM Interchanger Exchanger Nos. 1 (size of 5100mm in diameter and 41mm thickness ASME “U” Stamp, Weight: 136 tons Material: SA240 TP304H/SA409 N08811).
5. SABIC-PETROKEMIYA SHUTDOWN: Fabrication, Supply of Primary Decoke Drums with Gear Box EV- 115AB/116AB Nos. 4.
6. SABIC-PETROKEMIYA: Fabrication, Supply of U-Tube Bundle for Cold Ethylene Vaporizer AE-0610 Nos. 1.
7. SABIC-PETROKEMIYA SHUTDOWN: – Design, Fabrication of Plate Heat Exchanger for storage Ethylene Vaporizer RE.4806 Nos. 1.
8. ABDULLA ALBARRAK (ABIS) (CLIENT SABIC – SHUTDOWN): Retubing activities of Heat Exchanger Nos. 6.
9. SCECO-HAJR ELECTRICITY PRODUCTION (NOMAC)-SHUTDOWN: Retubing activities of Kettle Boiler, Super duplex piping, Vertical SS Foam Storage Tank and Internal blasting, Re-Building and Chemical Resistant Coating application for Condenser Pipe 100 M2.
10. SCECO (QURRAYAH): Site Removal, Site Installation, Cleaning, Full Re-Gasketing for Alfa Lava Plate type Heat Exchanger Nos.08.
11. SAUDI ARAMCO MSSD: Overhauling and Retubing of Air Cooler & intercooler Nos. 14.
12. ABB ELECTRICAL INDUSTRIES CO. LTD.: Retubing of 16000 HP Motor Cooler nos.2.
13. SABIC-IBN SINA: Mechanical Cleaning of Plate Type Heat Exchanger Nos.12.
14. FARABI PETROCHEMICALS COMPANY: Re-Tubing of Heat Exchanger Nos.2.

Feb 2025 - Present
INMA STEEL FABRICATORS CO. LTD., JUBAIL, K.S.A. Project Engineer

1. Study the contract / PO, project package & develop project objectives.
2. Conduct project kick-off meeting with concerned department and coordinate with cross functional execution team.
3. Study Project design, Deliverables, Customer requirements, Standard of performance and cost estimates
4. Establish project plan including invoicing plan, Project Risk analysis and Mitigation plans.
5. Monitor project progress, expedite submittals in co-ordination with other departments & ensure timely approvals are received.
6. Resolve any issues that arise within cross functional teams and with Client and coordinate team activities to maintain approved schedule & budget.
7. Monitor/Track details of additional SOW, de-scoping work, cost, and schedule impacts etc. & take-up with Client in timely manners.
8. Manage sub-contract work progress within budget and schedule. Get regular progress updates & ensure sub-contractor is meeting contractual obligations.
9. For special jobs where special materials to be used or special techniques/methodology to be used or special handling is required or special precaution to be taken, make fabrication procedure showing sketches of special jigs fixtures, different stage of fabrication etc.
10. Ensure that quality policy addressed in quality manual is implemented at all the places.
11. Obtaining mile-stone certificates, work completion certificates and advice Finance department for invoicing by providing necessary documentation in timely manner.
12. Actively contribute to the company’s team-working environment.