Site logo
Saudi Arabia
Member Since 2024
Photo

Ahmed Mohamed Abdelaziz Ali

About the Candidate

Work Experiences:

Senior Tendering & Procurement Specialist – Civil and Architectural Fields (Head Office)
Al-DAFE For Trading and Contracting | Riyadh, Saudi Arabia | JAN 2024 – Present.
Tendering & Procurement for projects with costs exceeding 300 million Saudi riyals.

• Reviewed project documents (drawings, specifications, conditions) to prepare pricing studies with 95%
efficiency and 5-10% cost reduction through competitive offer analysis.
• Successfully negotiated optimal prices and payment terms, achieving 85-90% adherence to quality standards
and project deadlines.
• Monitored project costs, generated comprehensive reports, and implemented corrective actions, resulting in 85%
cost-efficiency and a 5-10% reduction in expenses.
• Developed estimates based on quantities, materials, and specifications, achieving 90-95% efficiency and 10-15%
cost reduction by optimizing material use.
• Ensured timely availability of materials with 90% efficiency and 5-8% cost reduction by improving material
management and reducing waste.
• Selected optimal bids based on quality and price, achieving 90% efficiency and 5-7% cost reduction.
• Prepared contracts with suppliers and contractors, ensuring project success with 90-95% efficiency and 3-5% cost
reduction by specifying obligations clearly.
Senior Technical Office (QS, invoices and shop drawings)
Sky For Trading and Contracting – Sahel, Egypt | JAN 2022– JAN 2024
The project was valued at 200 million Egyptian pounds.

 Accurately determined required quantities based on plans, with 90% efficiency and 90-95% completion rate,
ensuring no shortages or excess.
 Ensured work matched BOQ estimates through site checks, achieving 90% efficiency and 85-90% completion
rate, minimizing discrepancies.
 Calculated subcontractor payments based on work performed, ensuring timely and accurate payments with 90%
efficiency and 90-95% completion rate.
 Submitted financial claims for completed work, ensuring 90% accuracy and an 85-90% project completion rate,
thereby maintaining optimal cash flow.
 Reviewed payment certificates to align with actual work, reducing errors with 90% efficiency and 85-90%
completion rate.
 Tracked material costs and executed work to maintain budget control, with 90% efficiency and 85-90%
completion rate.

Senior Technical Office (QS, invoices and shop drawings)
AL-HALAL For General Contracting – Cairo, Egypt | JAN 2019– JAN 2022
Managed The project and was valued at 500 million Egyptian pounds.

 Adjusted quantities based on scope changes, ensuring alignment with payment certificates (85% efficiency, 8085%
completion).

Worked with civil, architectural teams, and subcontractors to ensure timely material availability and workflow
(90% efficiency, 85-90% completion).
 Delivered periodic reports on work progress and quantities to stakeholders, ensuring effective communication
(90% efficiency, 85-90% completion).
 Ensured design drawings were clear and executable, aligned with project requirements (90% efficiency, 85-90%
completion).
 Created accurate shop drawings with precise details, ensuring on-site execution (95% efficiency, 90%
completion).
 Collaborated with architects and engineers to clarify design ambiguities and prevent trade conflicts (90%
efficiency, 85% completion).

Technical Office – Site (J. Planning, Technical Office and site)
Al-Ahram for General Contracting (AGC.CO) – Cairo, Egypt | JAN 2017– JAN 2019
The project was valued at 250 million Egyptian pounds.

 Used Primavera to define tasks, timelines, and milestones, ensuring coordination and deadlines (75% efficiency,
75% completion).
 Monitored project progress, identified potential delays, and recommended corrective measures to ensure timely
completion, achieving 70% efficiency and 80% project completion.
 Worked with project teams, contractors, and clients to resolve issues and align progress with goals (75%
efficiency, 85% completion).
 Assigned tasks and deadlines to site teams and subcontractors, ensuring efficient task distribution (90%
efficiency, 85% completion).
 Ensured work met quality standards and project specs before client approval (95% efficiency, 90% completion).
 Compiled reports for management, highlighting project status, risks, and corrective actions (90% efficiency, 85%
completion).

Site Engineer (Execution and supervision)
Map for Constructions – Cairo, Egypt | JUL 2015– JAN 2017
The project was valued at 100 million Egyptian pounds.

 Managed daily construction activities, ensuring compliance with project plans and safety standards, achieving
95% task completion rate and improving site productivity by 10%.
 Collaborated with subcontractors to ensure timely delivery of tasks, meeting 90% of deadlines and reducing
project delays by 15% through efficient communication.
 Conducted regular site inspections to ensure work met quality standards and project specifications, resulting in
98% adherence to quality benchmarks.
 Compiled detailed reports on project status, highlighting risks and suggesting corrective actions, leading to a 5%
improvement in execution speed and cost control.
 Managed material and manpower allocation, optimizing resource use and reducing wastage by 12%, contributing
to a 7% reduction in overall project costs.

Education

2015
Bachelor of Civil Engineering bachelor’s in civil engineering
Skills
CivilCostEstimatormanagerPlanningprocurement
Print Resume

Sign in

Sign Up

Forgot Password

Cart

Your cart is currently empty.

Share