Site logo
Elsheikh Zayed, Giza, Egypt
Member Since 2024

About the Candidate

 

Amr Mohsen Mounir

Mobile: +201007505413,

E-mail: amr_rabih@yahoo.com

OBJECTIVE

Working with high professional engineers in a biggest company operating in the field of Engineering and project management.

EDUCATION

• Bachelor of Electrical Engineering

Higher Technological Institute at 10thRamadan.

Graduation Year: 2005.

Graduation Grade: Good.

GRADUATION PROJECT

§  Arm Robotic controlled via PC.

§  Using VB6.

§  Supervised by:

Dr. Mohamed Zahra

§  Degree: Excellent.

Experience

A-    Head of Electrical Tender and Procurement Dept.  (2018 – Present)

Company: Protection For Contracting and Design (PSC)

Company Profile: PSC is a contracting Company; it has executed hundreds of projects in the fields of construction, and it has established specialized divisions for the Electric works.

B-   Tendering, QS and Procurement Engineer: (Duration: 2013 – 2018).

Company: Protection For Contracting and Design (PSC)

§  Responsibilities:

1.     Full responsibility for managing the all-Electrical tenders.

2.     Good knowledge with all tendering process (generating selections, design reviewing, installation reviewing and production audit).

3.     Submitting a detailed response to the enquiry documentation and provide answers/responses to any subsequent requests for clarification.

4.     Preparing of tender pre-qualification, and all the technical offer.

5.     Following up the technical and commercial offers with the suppliers.

6.     Negotiations with suppliers on both technical and commercial aspects of product.

7.     Support the Engineering Team Group with the maintenance and development of the cost, customers and supplier databases, pricelists and libraries.

8.     Finally, the responsible engineer for all electrical tenders in our company.

9.     Conducts market visits and trade shows to increase his market network and awareness.

10.  Responsible for the preparation of material submittals and subcontractor pre-qualifications.

11.  Responsible for the material submittal database.

12.  providing technical advice about the suitability of materials.

13.  Review responses to Request for Quotation (RFQ) and quotations, provide feedback.

14.  Attends site meetings as needed to coordinate procurement requirements.

15.  Responsible for providing material samples to site for client/consultant approval.

16.  Correspond with sub-contractors, suppliers, Project Managers, Construction Managers, Project Engineers, and Site Engineers to clarify sub-contractor and supplier queries.

§  The Projects that were studied and awarded at Tendering Engineer stage:

1.     TIBA FOR COMMERCIAL &DISTRIBUTION.

2.     TECHNOTAST FACTORY at 6th of October.

3.     New Extension for Nestle for water at Banha City.

4.     ORION Factory and the Administration Building at 6th of October.

5.     INDIGO TEXTILE / EGYPT at 6th of October

6.     EGYPT ANODE Factory at El Ain El Sokhna.

7.     COOKIE MAN Factory at 6th of October.

8.     UNIBOARD- ALMOUTAHEDA PAPER ^ BOARD FACTORY at Al-Sadat City.

9.     ELIF Factory at 6th of October.

10.  Glaxo SmithKline-Egypt (UPGRADE WETS PRODUCTION AREA).

11.  AstraZeneca Egypt for Pharmaceutical (GWONING BUILDING).

12.  NAFCO MISR FIRE FIGHTING FACTORY AT 6th of October.

13.  GULF INDUSTRIAL COM.(RAWASY) – POLY ETHYLENE PIPES FACTORY.

14.  ENMAA DAIRY FARM at ElWahat ElBaharyia.

15.  MITCHEL JOUNIOR Warehouse at 10th of Ramadan.

16.  COCACOLA NEW WREHOUSE AND COLD STORE.

17.  BEYTI PLANT EXTENSION B-08 – YOGHURT HALL.

18.  OBAGI Factory at Wadi ElNatron.

19.   And I have been completed a study of approximately 400 bids, at a rate of 35 to 40 bids per year.

C-   Site and Technical Office Engineer: (Duration: 2008 – 2013).

Company: Protection For Contracting and Design (PSC)

§  Responsibilities:

1.     Site Engineer has a full responsibility for the electrical works related to residential and Industrial construction such as lighting, power, data, and voice.

2.     Monitor the progress of Subcontractors.

3.     Supervise the specific site works in accordance with the project terms and obligations.

4.     Performing quantity surveys and following up and reporting the progress of construction.

5.     Collecting of materials to be purchased and following-up order requests

6.     Design the workshop drawing for the electrical works related to residential and Industrial construction such as lighting, power, data, and voice before the executing.

7.     Provide all necessary information to ensure that the specific work is execute in accordance with drawings and specifications.

8.     Reviewing the materials collecting according the workshop drawings.

9.     Preparing and do the material submittals and get the consultant approval.

§  The Projects at the Site and Technical office Engineer stage:

1.     TEMSA Egypt (Duration: Mar.2008 – Sep.2008):

§  Scope of work:

a.      Installation of power distribution network.

–            Medium voltage and low voltage cables.

–            Ring main units.

–            Oil Transformers.

–            Main Distribution boards – Distribution boards – Switch Boards.

b.     Street lighting system.

c.      Installation of the Interior Lighting and small Power systems (Lighting and Power Networks, Power Sockets, Disconnect Switches, and Combined Power Sockets).

d.     Installation of the Cable Trays network.

e.      Installation of Light Current Systems (Light Current Outlets, Data, Telephone, Public Address and Fire Alarm System).

f.       Installation and testing attendance for Earthing Systems (Medium Voltage, Low Voltage, and Light current earthing system).

g.      Preparing document papers, submittals, progress reports and invoices.

h.     Preparing the Client Invoices, and the Sub-contractors’ invoices.

i.       Preparing shop drawing and as built with coordination with other departments.

2.     Arabic for Aluminum Company (Duration: Oct.2008 – Jun.2009)

§  Scope of work:

a.     Installation of power distribution network.

–            Medium voltage and low voltage cables.

–            Ring main units.

–            Oil Transformers.

–            Main Distribution boards – Distribution boards – Switch Boards.

b.     Installation of the Interior Lighting and small Power systems (Lighting and Power Networks, Power Sockets, Disconnect Switches, and Combined Power Sockets).

c.      Installation of the Cable Trays network.

d.     Installation of Light Current Systems (Light Current Outlets, Data, Telephone, and Fire Alarm System).

e.     Installation and testing attendance for Earthing Systems (Medium Voltage, Low Voltage, and Light current earthing system).

f.       Preparing document papers, submittals, progress reports and invoices.

g.     Preparing the Client Invoices, and the Sub-contractors’ invoices.

h.     Preparing shop drawing and as built with coordination with other departments.

3.     Ragab Sons Storage (Duration: Dec.2008 – May.2009)

§  Scope of work:

a.      Installation of power distribution network.

–            Low voltage cables.

–            Main Distribution boards – Distribution boards – Switch Boards.

b.     Installation of the Interior Lighting and small Power systems (Lighting and Power Networks, Power Sockets, Disconnect Switches, and Combined Power Sockets).

c.      Installation of the Cable Trays network.

d.     Installation of Light Current Systems (Light Current Outlets, Data, Telephone, and Fire Alarm System).

e.      Installation and testing attendance for Earthing Systems (Medium Voltage, Low Voltage, and Light current earthing system).

f.       Preparing document papers, submittals, progress reports and invoices.

g.      Preparing the Client Invoices, and the Sub-contractors’ invoices.

h.     Preparing shop drawing and as built with coordination with other departments.

4.     Juhaina Storage (Duration: Mar.2009 – Sep.2009)

§  Scope of work:

a.      Installation of power distribution network.

–            Low voltage cables.

–            Main Distribution boards – Distribution boards – Switch Boards.

b.     Installation of the Interior Lighting and small Power systems (Lighting and Power Networks, Power Sockets, Disconnect Switches, and Combined Power Sockets).

c.      Installation of the Cable Trays network.

d.     Installation of Light Current Systems (Light Current Outlets, Data, Telephone, and Fire Alarm System).

e.      Installation and testing attendance for Earthing Systems (Medium Voltage, Low Voltage, and Light current earthing system).

f.       Preparing document papers, submittals, progress reports and invoices.

g.      Preparing the Client Invoices, and the Sub-contractors’ invoices.

h.     Preparing shop drawing and as built with coordination with other departments.

5.     Sphinx for glass factory (Duration: Sep.2009 – Nov.2009)

§  Scope of work:

a.     Installation of and Fire Alarm network and the System.

b.     Preparing document papers, submittals, progress reports and invoices.

c.      Preparing the Client Invoices, and the Sub-contractors’ invoices.

d.     Preparing shop drawing and as built with coordination with other departments

6.     Nestle for water at Banha City (Duration: Nov.2009 – April.2010)

§  Scope of work:

a.      Installation of power distribution network.

–            Low voltage cables.

–            Main Distribution boards – Distribution boards – Switch Boards.

b.     Installation of the Interior Lighting and small Power systems (Lighting and Power Networks, Power Sockets, Disconnect Switches, and Combined Power Sockets).

c.      Installation of the Cable Trays network.

d.     Installation and testing attendance for Earthing Systems (Medium Voltage, Low Voltage, and Light current earthing system).

e.      Preparing document papers, submittals, progress reports and invoices.

f.       Preparing the Client Invoices, and the Sub-contractors’ invoices.

g.      Preparing shop drawing and as built with coordination with other departments.

7.     Nestle for Nesquik Ext. Factory (Duration: April.2010 – Oct.2010)

§  Scope of work:

a.     Installation of power distribution network.

–            Low voltage cables.

–            Main Distribution boards – Distribution boards – Switch Boards.

b.     Installation of the Interior Lighting and small Power systems (Lighting and Power Networks, Power Sockets, Disconnect Switches, and Combined Power Sockets).

c.      Installation of the Cable Trays network.

d.     Installation and testing attendance for Earthing Systems (Medium Voltage, Low Voltage, and Light current earthing system).

e.     Preparing document papers, submittals, progress reports and invoices.

f.       Preparing the Client Invoices, and the Sub-contractors’ invoices.

g.     Preparing shop drawing and as built with coordination with other departments.

8.     Metro Market Warehouses at 6th of October.(Duration: Nov.2010 – Dec.2011)

§  Scope of work:

a.      Installation of power distribution network.

–            Low voltage cables.

–            Main Distribution boards – Distribution boards – Switch Boards.

b.     Installation of the Interior Lighting and small Power systems (Lighting and Power Networks, Power Sockets, Disconnect Switches, and Combined Power Sockets).

c.      Installation of the Cable Trays network.

d.     Installation of Light Current Systems (Light Current Outlets, Data, Telephone, and Fire Alarm System).

e.      Installation and testing attendance for Earthing Systems (Medium Voltage, Low Voltage, and Light current earthing system).

f.       Preparing document papers, submittals, progress reports and invoices.

g.      Preparing the Client Invoices, and the Sub-contractors’ invoices.

h.     Preparing shop drawing and as built with coordination with other departments.

9.     ELIF plastic industrial factory at 6th of October.  (Duration: Feb.2012 – Jan.2013)

§  Scope of work:

a.     Installation of power distribution network.

–            Medium voltage and low voltage cables.

–            Ring main units.

–            Oil Transformers.

–            Main Distribution boards – Distribution boards – Switch Boards.

b.     Installation of the Interior Lighting and small Power systems (Lighting and Power Networks, Power Sockets, Disconnect Switches, and Combined Power Sockets).

c.      Installation of the Cable Trays network.

d.     Installation of Light Current Systems (Light Current Outlets, Data, Telephone, and Fire Alarm System).

e.     Installation and testing attendance for Earthing Systems (Medium Voltage, Low Voltage, and Light current earthing system).

f.       Preparing document papers, submittals, progress reports and invoices.

g.     Preparing the Client Invoices, and the Sub-contractors’ invoices.

h.     Preparing shop drawing and as built with coordination with other departments.

D-   Technical support engineer: (Duration: Aug 2005 – 2008).

Company: Silicon21.

Company Profile: Silicon21 is a Data & Communication distributor company for Cisco, Linksys, PARADYNE, D-Link, NORDX/CDT, FLUKE network.

Responsibilities:

1.Supporting for resellers in the products which distributed in the company (H/W, S/W, and Configuration).

2.Servicing Cisco Routers, Cisco access switches, digital Paradyne Modems (DSL Modems, and Frame-relay over DSL Modems) Paradyne DSLAMs, Linksys WLAN products (Access points and cards), D-Link WLAN products, D-Link ADSL modems, ISDN modems, D-Link DSLAMs, and working on Fluke Tester.

3.   Open and handle cases with our suppliers for any product problem.

SKILLS

§  Computer Skills

1.     Perfect work with the AutoCAD drawing.

2.     Good Knowledge of drawing by Revit.

3.     Good Knowledge of Dialux program.

4.     Excellent in using Microsoft application (Word, Excel, and Power Point).

5.     Excellent in using Internet and E-mail programs (MS Outlook and Outlook Express).

6.     Fair in using the MS Project.

§  Language skills

7.     Arabic: Native Tongue.

8.     English: Good in reading, spoken, and written.

PERSONAL INFORMATION

§  Nationality: Egyptian

§  Marital status: Married

§  Military service: exempt

§  Date of Birth: 19/12/1983

Print Resume

Sign in

Sign Up

Forgot Password

Cart

Cart

Share