About the Candidate
SUMMARY
FERDI FEBRIANTO
BACKGROUND
OCT 2018 – PRESENT AUG 2017 – OCT 2018 JUN 2016 – AUG 2017 NOV 2015 – DEC 2016 JAN 2015 – NOV 2015 JAN 2014 – AUG 2014
RELEVANT EXPERIENCE
AUG 2017 – OCT 2018
More than 4 years experiences in Instrument & Control Engineering, Mechanical Engineering, Sales and Procurement activities in Manufacturing, Biodiesel and Palm Oil, F&B and EPC project.
Familiar with Project Management, Project Controlling, Risk Management and Report.
Direct experiences on Marketing, Sales and Procurement.
Run Own Business
Account Manager, PT Azbil Berca Indonesia
Project Manager, PT Azbil Berca Indonesia
Site Manager, PT Azbil Berca Indonesia
Sales Engineer, PT Azbil Berca Indonesia
Assembling Frame Production Supervisor, PT Honda Prospect Motor
PT. Azbil Berca Indonesia
As Account Manager
PROJECT PT. LDC INDONESIA :
Supply Electromotor for Replacement Biodiesel Area
Supply Pump and Electromotor for methanol and HCL
Jakarta
Lampung
Supply, Install and Commissioning electrical COS for Pump Biodiesel
Area
Particular responsibilties including :
Sales for product and solution
Design product as client request
Procure the material needed
CONFIDENTIAL
PROJECT PT. POLYTAMA PROPINDO : Indramayu Upgrading DCS for MCR Plant
Expansion DCS for MCR Plant
Engineering and commissioning for digital control MCR and PCR Plant Supply Digital Control for MCR and PCR Plant
Particular responsibilties including :
Sales for product and solution
Design system configuration for DCS installation
Site Survey
Offer as client request
Procure the material needed
Supervise and lead a team for engineering and commissioning
PROJECT PT. YAMAZAKI INDONESIA :
Supply Temperature and Humidity Sensor
Particular responsibilties including :
Sales for product and solution
Site survey for detail client needed
Procure the material
PROJECT PT. GULA PUTIH MATARAM :
Supply, Install and Commissioning PLC for replacement AB
Particular responsibilties including :
Sales for product and solution
Site survey for detail
Design system configuration
Procure the material
PROJECT PT. INDOLAMPUNG DISTILLERY :
Supply, Install and Commissioning mini DCS for Separator 1 & 2
Karawang
Lampung
Lampung
CONFIDENTIAL
JUN 2016 – AUG 2017
Particular responsibilties including :
Sales for product and solution
Site survey and meeting with client
Design system configuration and instruction for installation
Negotiate with client for price of quotation
Procure the material
PROJECT PT. WIJAYA KARYA :
Fire & Gas System for Feni Plant Haltim
Particular responsibilties including :
Sales for product and solution
Design system configuration Negotiate
Procure the material
PROJECT PT. NIPRO INDONESIA JAYA : Supply Humidity Sensor
Particular responsibilties including :
Sales for product and solution Supply
Procure the material as needed
Project Manager
PROJECT PT. LDC INDONESIA :
Bag Filter & Strainer ISO Project
Automation FABA Handling System/Silo Project Cooling Tower Optimation Project
Particular responsibilties including : Design review Multi Discipline
Halmahera
Karawang
Lampung
CONFIDENTIAL
NOV 2015 – DEC 2016
Establish and maintain Project Management process
Project Verification onsite with client
Preparing Proposal
Budget and Schedule Controlling
Coordinate and establish Project Work Breakdown Structure (WBS)
Start up & Commissioning
Site Manager
PROJECT PT. LDC INDONESIA : Lampung Supply for Steam Distribution & Boiler Feed Water Project
Addendum for Supply, Install & Commissioning Flowmeter for WTP, WWTP & Nitrogen
Particular responsibilties including :
Design review Multi Discipline
Establish and maintain Project Management process
Project Verification onsite with client
Daily, Weekly & Monthly report to Project Manager
Preparing Proposal
Budget and Schedule Controlling
Coordinate and establish Project Work Breakdown Structure (WBS)
Start up & Commissioning
Sales Engineer
PROJECT PT. LDC INDONESIA : Lampung
Supply, Install & Commissioning Flowmeter for WTP, WWTP & Nitrogen
Supply for Steam Distribution & Boiler Feed Water Project Particular responsibilties including :
Prepare document tender
Preparing Proposal
Technical Clarification
Negotiation
Approval Document
JAN 2015 – NOV 2015
CONFIDENTIAL
Vendor clarification & negotiation
Procure the material
PROJECT PT. WIJAYA KARYA : LPG Refrigerate Tj Sekong LPG Manggis
LPG Teluk Kabung
PLTD Selayar
Pertagas Gresik
CCTV for Tanjung Uban
Particular responsibilties including :
Prepare document tender
Preparing Proposal for Instrument & Control
Technical Clarification
Negotiation
Procure the material
PROJECT PT. ANEKA TAMBANG : Additional KILN 4 Replacement ESF 3
Offgas Treatment
Particular responsibilties including :
Prepare document tender
Preparing Proposal for Electrical & Instrument Control
Technical Clarification
Negotiaton
Procurement
PT. JURONG ENGINEERING LESTARI :
Supply, Install & Commissioning Instrument & Control for PT SMI
Jakarta
Pomalaa
Cilegon
CONFIDENTIAL
JAN 2014 – AUG 2014
Karawang
EDUCATION
2007 – 2013 2004 – 2007
Yogyakarta Pekanbaru
Particular responsibilties including :
Support EPC for document tender
Preparing Proposal for Instrument & Control
Technical Clarification
Negotiaton
Procure the material
PT. KINDEN INDONESIA :
BMS, Engineering & Service Project for PT. EPSON
Particular responsibilties including :
Prepare document tender
Preparing Proposal for BMS
Technical Clarification
Negotiaton
Procure the material
PT. HONDA PROSPECT MOTOR
Assembling Frame Production Supervisor
Particular responsibilties including :
Control over 450 man power per day with 2 shift
Controlling production per shift and day
Work with 5S/5R
Think how to get cost down and Kaizen (Improvement)
Gadjah Mada University
Engineering Physics
Cendana Rumbai High School
Cikarang
CONFIDENTIAL
COURSES
SEP 2014 – NOV 2014
PERSONAL DETAILS
Basic Instrument Engineer (IN TOOLS) – ApGreid
Place/Date of Birth :
Pekanbaru / 23 February 1989
Contacts :
Phone : +62 811 916 6860
Email : febriantoferdi@gmail.com
Share
Facebook
X
LinkedIn
Telegram
Tumblr
Whatsapp
VK
Mail