Site logo
Riyadh, Riyadh governorate, Riyadh Region, 11131, Saudi Arabia
Member Since 2024

About the Candidate

Personal detail:
Name: INZAMAM ASHRAF S/O MOHAMMAD ASHRAF
Field: Mechanical Engineering Age: 29
PEC Number: 36154 Religion: Islam
Address: Saudi Arabia Riyadh Date of birth: 15/11/93
Mobile: +966590678492 , +923029298343 Nationality: Pakistan
E mail: Inzamam.pge@gmail.com
LinkedIn: https://www.linkedin.com/in/inzamam-ashraf-9b81ab106/
Experience:
(CAPITAL METRO COMPANY) RIYADH METRO PROJECT
3 year Experience (1st March 2020 to working)
Designation: System and Com expert Line 2.
Responsibilities. (Platform screen Doors)
1. Responsible of operation and maintenance of PSD doors at line 2 .
2. Support contractors and subcontractors for installation of PSDs at line 1,2.
3. Reporting daily, weekly and monthly activity report to Engineer/manager in-charge.
Responsibilities. (Signaling department)
1. Support signaling team for maintenance of equipment install on track side.
2. Maintenance of Point machine.
3. Report to engineer/manager in-charge.
OASIS AUTOMATIC DOORS ABU DHABI.
1.5 year experience
June 2019 to February 2020.
Designation: Technical Coordinator/Operations manager
Responsibilities.
4. Responsible of all operations, site coordination, material arrangement, purchasing, directly reporting
to MD.
5. Technical coordination with technical teams working on sites with back-end support.
6. Daily Scheduling and planning for next working day as per approved works.
7. Schedule information pass to technicians and assign their duties on different sites.
8. Material arrangement for all sites as per works.
9. Responsible of store, its record, maintenance, material and counts.
10. Purchasing. International and local as per work requirement
11. Material purchase & invoice submission to accounts.
12. All AMCs clear with client satisfaction.
13. All technician salary issues & over time issues.
14. Proper invoice submission after completion of work.
15. Proper information for technical and sales team.
16. Safety class for technical team.
17. Workman Compensation insurance for technicans.
18. Technicians attendance and management.
PAK GERMAN ENGINEERS
2 year (Automation) in 16 July 2017 to May 2019
Designation: Project Manager
Responsibilities.
1. Manage project of ’Supply, Installation, Testing, Commissioning, Operation & Maintenance of
Platform Screen Doors for construction of Metro Bus System Multan – Package-8 (Group-1)’.
2. Manage projects in excess of RS 1128492, from concepts through to successful installations and
warranty management, which include liaison with both internal and external clients, contract and
project administration, monthly cash flow and planning and scheduling Technical, non-technical
crews.
3. Manage the administrative process of contracts for major clients, including GM, MD and Project
director.
4. Prepare competitive quotes of various sizes for entire projects, estimating the cost of materials,
labor and equipment and applying prices aimed at securing a strong profit margin.
5. Collaborate with Sales, Marketing, and Contractors in formulating project strategies and
delivering customized polymer systems/solutions to meet clients’ requirements.
6. Minimize warranty repairs through project evaluation and working collaboratively with
contractors.
7. Develop, maintain and foster effective relationships with clients, providing update on projects and
resolving any issues/concerns promptly to ensure their satisfaction.
8. Ensure smooth operations by creating work schedules for 44 operators complete with timelines,
budgets and specification guidelines for Operation & Maintenance of Platform Screen Doors for
construction of Metro Bus System Multan.
9. Manage technical crews working on industrial and commercial projects, ensuring high level of
workmanship and effective utilization of labor, materials, and equipment.
10. Select, interview and recruit new technical crews and orient them on company’s policies and
quality control standards related to all type of industrial and commercial installations.
11. Conduct on-site meetings to discuss project progress with crews and troubleshoot and resolve any
issues/problems impeding smooth workflow.
12. Determine yearly price increases and profit margins for products by evaluating competitive
pricing structures and market acceptance for price increases.
13. Dealing with International supplier (GRUPSA Spain).
14. Dealing with consultant and Client regarding Project.
15. Making of monthly Salaries of whole team according to company rules and regulation.
As a Marketing Manager.
1. Holds full responsibility for all marketing and communication matters in southern Punjab
region.
2. Marketing of New products of Company in near whole district.
3. Making of quotations according to demand of clients.
4. Working on tender documents and quote according to recent prices.
5. Participate in biddings of different tenders.
As a Site Engineer.
(July 2017 to May 2018)
Work Description:
Automation and Electrical:
1. Installation, Testing, Commissioning, Operation & Maintenance of Platform Screen Doors for
construction of Metro Bus System Multan – Package-8.
2. Installation and Maintenance of SCADA system of Platform Screen doors for their Remote
monitoring and control.
3. Installation of traffic signals in Bahria town Karachi, Rahimyar khan and different regions of
Pakistan.
4. Installation and Maintenance of Road barriers, Tire killers etc.
5. Installation of Solar Panels, batteries, and UPS. Trouble shooting of UPS, Motors.
Mechanical and HVAC:
1. Basic trouble shooting of Generators.
2. Installation and Maintenance of Air Condition systems i.e., Split System, Window Air
Conditioner, Air coolers and their service and maintenance.
Networking:
1. Networking of different equipment with local network connection. IP configurations. Subnet
mask, Gateway address configurations.
Traffic Signal installation Project:
1. Organize all the Site staff to execute project within stipulated time.
2. Make Schedule of all components of project to be executed according to Scheduled time.
3. Arrange weekly progress meeting and send one copy of one minute to Head office.
4. Execute all the works according to Drawing, Design, and specifications.
Plat form Screen Doors Operation and Maintenance.
1. Organize all Site Staff, their Duties and Responsibilities.
2. Routine checkup and maintenance of all PSD doors and all their equipment at all 21 stations.
3. Responsible of technical work of whole site.
Monitoring Officer.
(September 2017 to March 2018)
Responsibilities.
1. Work as Monitoring officer in Command-and-Control room of Metro Bus System Multan.
2. Monitor all PSDs door technical issue through SCADA software at Command-and-control room.
3. Maintain daily incident and action report of PSDs issue according to prescribed format by client.
4. Resolve complains within time limit by technical team.
5. Manage all operators and technical team according to rules and regulation prescribed by Punjab
mass transits authority.
6. Weekly progress report to Project Manager.
7. Dealing with client on any technical issue for smooth working.
Assistant Engineer (3 years) (June 2014 – May 2017)
Responsibilities.
1. Assist engineer in-charge in documentations, letters, diary numbers etc of different projects.
2. Check smooth running of HVAC systems, generators and electrical system, reported to engineer.
3. Operation and Maintenance of HVAC (split system, window AC, and coolers, duct leakage etc).
4. Maintenance of Generators.
5. Everyday progress report to engineer-in-charge.
Qualifications:
Degree University/Board Marks
BS Mechanical Engineering COMSATS institute of information
and technology SAHIWAL
3.11/4
FSC Pre Engineering SUPERIOR COLLEGE OKARA 875/1100
Matric DPS RENALA KHURD 910/1050
Short courses:
HVAC Designing
1: Cooling load calculations Manually by CLTDc method.
2: HAP (Hourly analysis program). The program is a powerful tool for designing systems and sizing
system components.
3: Zamil software for Calculations and Design of HVAC system.
4: Duct sizer (for sizing of duct and pipes).
In this course I learn Cooling load calculations and designing of DUCT and Air conditioning system.
Project Planning Scheduling and Progress Monitoring
1: Primavera P6 Software.
2: Planning of projects, making of Base line according to planning, Progress monitoring of running
project, Technique to control budget.
Online Courses:
1. Introduction to Oil Country Tubular Goods (OCTG)
OCTG Products Introduction
Steel Grades, Connections, String Design and Material Selection, Production Processes
2. Introduction to Running Pipe in Oil and Gas Wells
Introduction to Running Services, OCTG Services Overview, Why Pipe Matters
Pre-running Operations, Pre-running Operations, Drifting Activity, Visual Inspection Activity, Pipe
Length Measurement Activity, Running Tools, Running Accessories, Running Equipment ,Running
Operations, Alignment, Thread Compound, Make-Up Analysis Assembly Sequence.
Study Projects:
HVAC designing of Management Science Department of COMSATS Sahiwal
Cooling load Calculations, Duct Designing, fan and equipment selection, Air conditioning equipment
selection, Rate Analysis.
Designing of Robotic Arm:
Design and analysis of Robotic arm in ANSYS Workbench.
Designing of Colum and Buckling test.
Skills and Software:
1: AutoCAD. (Mechanical and Electrical).
2: ANSYS Workbench. (Designing and analysis i.e. Thermal Analysis, Air Flow Analysis, Load
Analysis, Stress Strain deformation analysis etc.).
3: MS Office (Excellent in Excel, word and Power point).
4: Primavera P6 (Project planning scheduling and progress monitoring software).
5: ZAMIL (Cooling load calculation software for HVAC designing)
6: HAP (Hourly Analysis Program) for HVAC Designing.
7: DUCT Sizer (For Duct designing of HVAC system).
8: SCADA software for control and troubleshooting of Platform Screen doors at Multan Metro Bus

Education

2013-17
Comsats institute of information and technology pakistan BS Mechanical Engineering
Skills
contract managementHVAChvac designInstallationmechanicalOPERATION AND MAINTENANCEPlanningSite managementSupervisionTeam leader
Print Resume

Sign in

Sign Up

Forgot Password

Cart

Cart

Share