About the Candidate
I have 10+ years’ experience in 132/220/500kV Substations & 500kV HVDC Convertor Station Projects in MEPCO, HESCO, NTDC & DHA phase 8 & 9 in Pakistan. I did my BSc in Civil Engineering in 2013 and my MS in Project Management in 2018. I got the Professional Engineer title from the Pakistan Engineering Council (PEC).
I am sure I have the required education, experience, and track record to work with your organization. In addition, I am motivated and enthusiastic and would appreciate the opportunity to contribute to your organization’s success. I am very excited and passionate about this opportunity, and I will work really hard to uplift the company’s reputation. I hope I can further demonstrate my enthusiasm for a job interview.
Education
Experience
● Led CASA-1000, 500kV HVDC Project as a civil engineer under COBRA, ABB and Hitachi Energy.
● Monitored project timelines, ensuring strict adherence to schedules, while preparing daily and weekly reports.
● Coordinated closely with all stakeholders, leading a team of supervisors and HSE officers to meet project standards.
● Managed on-site construction activities, including earth works, equipment and gantries foundations, control and switch room buildings, roads, drainages, fence, main earthing system and lighting protection, ensuring compliance with drawings.
● Implemented and enforced strict adherence to HSE and QA/QC requirements, significantly reducing safety incidents. Managed NCR and ITP.
● Handled change orders, method statements, procurement, and Request for Inspection (RIF) processes, streamlining operations.
● Verified and approved subcontractor’s Interim Payment Certificates (IPC), ensuring budget adherence.
● Completed the project within budget and timelines, maintaining quality standards.
● Managed project cost estimates, technical reports, and project specifications
● Led project planning in Primavera P6 and MS Project, ensuring efficient schedule monitoring, and the preparation of daily and weekly progress reports.
● Managed tender document preparation, stakeholder meetings, and coordination between site and head office staff.
● Oversaw site construction activities, including material rate analysis and implementation according to engineering drawings.
● Prepared and verified interim payment certificates with consultants and subcontractors, ensuring accurate financial documentation.
● Maintained on site documentation for quality control tests and progress tracking, including concrete pouring slips and cylinder compression tests.
● Implemented civil construction works as per designs, including switch yard foundations, control and switch room buildings, roads, fence and water supply and sewerage systems.
● Created detailed bar bending schedules for structural components, enhancing construction efficiency.
● Managed material records and site procurement, ensuring availability and optimal use of resources.
● Managed cost estimates, technical reports, and project specifications.
● Prepare all civil drawings related to grid stations and transmission lines. Prepare a bar-bending schedule for controlling house building, house slabs, equipment, and pile foundations.
● Design drawings, review, and approval of the design work of 132kV grid stations for civil work of general layout drawings, switchyard foundation layout, equipment foundation drawings, control house buildings, roads, water supply and sewerage work, and associated residential houses, etc.
● Review the soil investigation reports for grid stations and transmission line.
● Design and review foundations for 20°, 15°, and 10° angles of repose for 132kV D/C transmission line towers, and also prepare stacking sheets for transmission line towers.
● Quality Control Inspecting different sites for grid stations as well as carrying out inspections for 132kV transmission line tower materials, including testing of angle bars, gusset plates, foundation stubs, nuts and bolts, galvanization, etc. in Lion Steel Industries (Pvt.) Ltd. and Spleen Manufacturing (Pvt.) Ltd.
● Project schedules are monitored and controlled.
● Prepare the Bill of Quantity for DHA Phases VIII and IX.
● Review the bid evaluation for DHA Phase VIII and IX.
Share
Facebook
X
LinkedIn
Telegram
Tumblr
Whatsapp
VK
Mail