Site logo
Karachi Division, Sindh, Pakistan
Member Since 2024

About the Candidate

Looking for a challenging career in Maintenance Electrical, HVAC, Utilities and Projects with a progressive organization where my passion, ideas and skills can be used in better productive way.

Education

2014 –2019
IOBM (Institute of Business management) MBA (Environment &Energy Management )

The specialized MBA program in “Sustainability, Energy, and Environment” aims at providing skills and tools needed for analyzing, understanding, and assessing strategic decisions about energy production, sustainability, and climate change mitigation.

Jan 2009 –Feb 2013
NED University of Engineering and Technology Karachi B.E Electrical Engineering

Studied principles of electricity, electronics, and electromagnetism to develop electrical products and systems. that can perform risk assessments and ensure compliance with safety standards and electrical engineering codes.

Experience

March 2016 - To Date
Scilife Pharma(Pvt) Limited Manager Engineering & EHS

• Coordination with Project Manager and Contractors for the smooth handling of the projects within budget and time.
• To ensure proper implementation of Safety working & Implementation of HSE (Health Safety & Environment) Standards.
• Housekeeping of the entire Technical area and other related areas.
• All layout of ducting and piping work according to approved layout and all tests are carried out as per SOP.
• Supervise Mechanical ,Electrical and Electronic related activities of Pharma machines.
• HVAC Air and Water balancing should be done as per approved parameters.
• Coordination with QA Team for room’s qualification.
• Supervision of Mechanical activities which is under progress by contractors on site. Close follow up of time line and implementation.
• Ensure availably of all owner supplied items in time and installation as per schedule.
• Shop drawing check and verification and approval taken by Project Manager.
• Finally smooth operation of Air Conditioning and Utilities equipments.
• Energy conservation program implementation.
• Awareness of HSE to Technical staff for the smooth operation of all utilities plant.
• Processing spare parts / inventory up to date control.
• Annual maintenance of all Utilities Electrical, HVAC & water System equipments with preparation of proper schedule, materials requirement data sheet and implementation of program.
• Planning to be made for future Control of Utilities Electrical & HVAC system and report generation.
• Environment Monitoring and control of all production rooms with proper log book entry.
• Issue of the Gate Pass of department related returnable items.
• Preparation of the Requisitions for the Equipments, Machines Parts and consumables materials of engineering.
• Preparation of Work Permit for contractor and in house job. HSE, Welding, Fire, Electric work on HT and Height etc.
• All Utilities Equipments log book record keeping.
• CAEX and OPEX control of department and capitalization.
• Ensure the smooth availability of energies to all production plants round the clock i.e. Water, Steam, Electricity, Gas, PW Water, Waste Water Plant, Communication, and Network.
• Beside above responsibilities any emergency assignment can be assigned by the department head.

November 2014 – March 2016
Sanofi – Aventis Pakistan Limited Assistant Manager – HVAC

• Ensure the smooth availability of energies to all production plants round the clock i.e. Electricity, HVAC, Water, Steam, Gas, PW, Compressed air, and Communication.
• CAPEX and OPEX control of department and capitalization.
• Installed and commissioned successfully 730 KVA,550 KVA,330 KVA & 350 KVA Electrical Generators.
• Installed and commissioned successfully 2500 KVA, Electrical Transformer.
• Successfully complete Energy Saving projects (Reuse of Ro rejected water)
• Successfully installed steam condensate recovery System
• Successfully installed VFD’s in all AHU’s
• Successfully installed and commissioned Oil Free Air Cooled Air Compressors with Desiccant Dryers and filters assemblies.
• Successfully installed and commissioned De-Ionization Plant.
• Successfully installed and commissioned Stability chambers.
• Successfully installed and commissioned Steam Generators 1ton & 2 ton.
• Optimize resources utilization, ensure work safety, continuous process improvement, Energy monitoring according to cGMP requirements.
• Conduct self-inspections and internal audits of all energy functions.
• Liaison with regulatory authorities to obtain necessary approvals.
• Ensure SOPs timely preparation and its implementation
• Trouble shooting & preventive maintenance of all the HVAC section including all the buildings on site and spare parts management.
• Coordination with Project Manager and Contractors for the smooth handling of the projects within budget and time.
• Air Balancing, Area Pressure Balancing, and Validation.
• Supervision of Mechanical activities which is under progress by contractors on site. Close follow up of time line and implementation.
• Ensure availably of all owner supplied items in time and installation as per schedule.
• Shop drawing check and verification and approval taken by Project Manager.
• Energy conservation program implementation.
• Processing spare parts / inventory up to date control.
• Annual maintenance of all Utilities Electrical, HVAC & water System equipments with preparation of proper schedule, materials requirement data sheet and implementation of program.
• Planning to be made for future Control of Utilities Electrical & HVAC system.
• Environment Monitoring and control of all production rooms with proper log book entry.
• Issue of the Gate Pass of department related returnable items.
• Preparation of the Requisitions for the Equipments, Machines Parts and consumables materials of engineering.
• Awareness of HSE to Technical staff for the smooth operation of all utilities plant
• To ensure proper implementation of Safety working & Implementation of HSE (Health Safety & Environment) Standards.
• Housekeeping of the entire Technical area and other related areas.
• Preparation of Work Permit for contractor and in house job. HSE, Welding, Fire, Electric work on HT and Height etc.
• All Utilities Equipments log book record keeping.

Nov-2013 to Nov-2014
Getz Pharma (Pvt) Limited (3rd Party) Trainee Engineer

 Primarily responsible for managing HVAC and utilities department.
 Operation and maintenance of Chiller, AHU, Dehumidifier, Reverse Osmosis Plant, Purified Water, Water for Injection Plant, Pure Steam Generator, Boiler, Compressors, and Nitrogen Plant
 Installed and commissioned successfully 75,000 GPD Brackish water Reverse Osmosis Plant, Two stages Fully Automated with PLC
 Installed and commissioned Clever Brookes Dual Fuel 4 passes Steam Fire Tube boilers with De aerator.
 Successfully installed and commissioned Atlas Copco Screw Oil Free Air Cooled Air Compressors with Desiccant Dryers and filters assemblies.
 Involved in the installation of Stand by Diesel Generators and Prime Gas Engine 2 MW each.
 Developing, coordinating, and implementing the aims and objectives of strategies and policies to reduce production down times and energy consumption
 Improved over all energy utilization and improved infrastructure by initiating and completing Building management system (Schneider).
 Redefine Utilities Operation through process mapping on SAP
 Developed SOPs for the plant.
 Planning and ordering of spare parts of plant’s equipments when required
 Primarily responsible for managing HVAC and utilities department.
 Operation and maintenance of Chiller, AHU, Dehumidifier, Reverse Osmosis Plant, Purified Water, Water for Injection Plant, Pure Steam Generator, Boiler, Compressors, and Nitrogen Plant
 Installed and commissioned successfully 75,000 GPD Brackish water Reverse Osmosis Plant, Two stages Fully Automated with PLC
 Installed and commissioned Clever Brookes Dual Fuel 4 passes Steam Fire Tube boilers with De aerator.
 Successfully installed and commissioned Atlas Copco Screw Oil Free Air Cooled Air Compressors with Desiccant Dryers and filters assemblies.
 Involved in the installation of Stand by Diesel Generators and Prime Gas Engine 2 MW each.
 Developing, coordinating, and implementing the aims and objectives of strategies and policies to reduce production down times and energy consumption
 Improved over all energy utilization and improved infrastructure by initiating and completing Building management system (Schneider).
 Redefine Utilities Operation through process mapping on SAP
 Developed SOPs for the plant.
 Planning and ordering of spare parts of plant’s equipments when required

Skills
Compliance & ReportingEngineering MaintenanceHSEOEEProject management
Print Resume

Sign in

Sign Up

Forgot Password

Cart

Cart

Share