Well experienced in Engineering design, Construction, Pre-comm. Comm., and operation activities with total professional experience of 36+ years.
Working with world class EPCs and PMCs since 2008 and leading multinational team successfully.
Having worked in countries like Saudi Arabia, Singapore, South Korea, Vietnam, Dubai and Uzbekistan.
Commissioned total of 11 plants successfully out of which 6 plants were of Polypropylene.
Passed professional certification exams successfully
Profile Overview
Well versed in Pre-comm., Comm. work planning for successful execution
Involvement in detail design of plant and giving suggestion w.r.t. procurement, safety review, commissioning
Involvement in PID, HAZOP, HAZID and 3D model review for betterment of design
Well experienced in the use of international design codes and standards
Having recognized as a hardworking professional with exceptional attention to details
Extra neck for modifications, to solve problems at different stages in project
Having excellent written and communication skills
Experienced in communicating and coordinating vendor activities with best results
Liasoning experiences with Procurement team, for requirement planning during Project and Pre-commissioning and Commissioning stages
Coordinating with EPC contractor and owner as PMC manager to safely execute project
Path setting team leader for colleagues and sub-contractors
Excellent results achieved while training different discipline staff
Certification
Piping/Pipeline 3D design, stress analysis
Software Skills
Review Software: Nevis work Review, Smart plant Review
MS-Office tool: Microsoft Word, Excel/Access, Power Point
Professional experience as follows:
April 2023 to Aug 2023
Company: ILF Consulting Engineers
Position: PMC Engineering Manager
Project: Gas project of wellheads, separation system, Sulphur removal and storage/dispatch
Client: SGPP, Tashkent, Uzbekistan
Nature of Work
Coordinating with Contractor during detail design for construction to attain quality work
Helping Commissioning Manager in Planning of commissioning
Coordinating with Contractor and sub-contractor for planning and execution of safe construction, Pre-commissioning and commissioning
Coordinating with Contractor vendors for compressors, pumps, packages and other equipment
Guiding client operating staff for process, commissioning and operation
Helping Client in solving technical problems during procurement, design, construction and commissioning
April 2020 to Mar 2021
Company: Bureau Veritas
Position: PMC Commissioning Manager (PP/HDPE/Utilities and Bagging plant)
Project: Shurtan GCC Upgrade Project. Tashkent, Uzbekistan comprising Refinery, Polymer, Utilities
Client: Shurtan GCC.
Nature of Work
Coordinating with Contractor during detail design for construction and Pre-commissioning to attain quality work
Planning of commissioning for 2 Polymer plants. PP of 100 KTPA and HDPE of 280 KTPA
Coordinating with Contractor and sub-contractor for planning and execution of safe construction, Pre-commissioning and commissioning
Guiding a team of Client Commissioning Engineers to prepare plant for safe commissioning
Coordinating with Contractor vendors for compressors, pumps, packages and other equipment
Guiding client operating staff for process, commissioning and operation
Helping Client in solving technical problems during procurement, design, construction and commissioning
April 2021 to June 2022
Company: Bureau Veritas
Position: PMC Engineering Manager (PP/HDPE/Utilities and Bagging plant)
Reviewed design documents submitted by contractor and submitted comments where applicable
I Checked comments on technical documents, reviewed by different discipline engineers of PMC if comments were complying with project and Government standards or not. Also, checked if comments and observations were practical or not.
Interacted with Compressor, major pumps and Extruder vendors for design part and gave some suggestions to improve their design to make project better and particularly – more safe.
Took part in weekly meeting with Contractor, Client, Vendors and Sub-contractor (Hyundai who handled detail design) to solve technical issues of design and find best solution to move ahead.
Also, took part in meeting with Vendors to streamline design, production and delivery of different project items to fill gapes in procurement and construction schedule.4
Took part in meetings held every 2 months with Licensor, to clarify technical issues faced during design stage, to get Licensor’s suggestions on major vendor items like Reactor pump and Recycle Gas Compressors, which are very critical in plant.
Had meeting with some critical Electrical motor vendor to solve winding temperature issues faced during design.
Guided Client discipline engineers in various design problems realized during detail design.
Convinced Contractor team members to implements many HAZOP recommendation in updating design to make project more safe to operate.
June 2019-Aug 2019
Company: China Kunlun Contracting and Engineering Co.
Position: Dy. Commissioning Manager
Project: PP plants, Paradip Refinery, Orissa, India.
Client: Indian Oil Corporation Ltd.
Nature of Work
· Planning of commissioning of 2 PP lines of 330000 MT each
· Coordinating with Client (Indian Oil Corp) and PMC for planning and execution of safe commissioning
· Leading a team of CKCEC Chinese members to prepare plant for commissioning
· Coordinating with vendors for compressors, pumps, packages
· Training client operating staff for process, commissioning and operation
· Helping Comm. Manager in solving technical problems during commissioning
Feb 2019-May 2019
Company: ThyssenKrupp Industrial Solutions India.
Position: Commissioning Manager (PMC)
Project: PP plants, Paradip Refinery, Orissa, India.
Client: Indian Oil Corporation Ltd.
Nature of Work
Checking planning work of contractor to commission 2 PP lines of PP
Coordinating with EPC contractor on behalf of Client (Indian Oil Corp) for planning and execution of safe commissioning
Leading a team of PMC members to prepare plant for commissioning
Training and guiding client operating staff for process, commissioning and operation
Giving client solutions for technical problems in design, construction, pre-comm., Comm.
April 2015-Jan 2016
Company: GS E&C, South Korea.
Position: Sr. Commissioning Engineer
Project: NSRP Project.
Client: Vietnam Oil & Gas and other 3 partner companies
Nature of Work
Looking after preparation work for the commissioning activities. The preparation work various procedures, manuals, cleaning methods, planning work, schedule for pre commissioning and commissioning
My role included assisting commissioning manager, reviewing vendor documents for commissioning activities, coordinating with various disciplines for smooth project work
Visiting construction site for better coordination between construction team and commissioning team
Attended commissioning workshop arranged with client and PMC, at site
Dec 2012-May 2013
Company: Petrofac, Dubai.
Position: Commissioning Manager
Project: Badra Oil & Gas Project.
Client: Gazprom Neft, Russia
Nature of Work
Looking after preparation work for the commissioning activities. The preparation work included various procedures, manuals, cleaning methods, planning work, schedule for pre commissioning and commissioning.
My role included Leading and guiding commissioning & preservation engineers, reviewing vendor documents for commissioning activities, guiding manual preparation team, coordinating with various disciplines for smooth project work.
Also, I visited construction site for better coordination between construction team and commissioning team.
I maintained close coordination with client team for better execution of pre commissioning and commissioning activities.
Main area of my work was to coordinate with various disciplines during design period to accommodate proper Precommissioning and Commissioning work.
Aug 2008-May 2012
Company: Samsung Engineering, South Korea
Position: Commissioning Manager
Nature of Work
Since Aug 2008 worked in Samsung for new project development
I was part of project team for Polypropylene project team of Saudi Kayan, as Precommissioning Engineer handing pre-commissioning and commissioning and activities planning and execution. Also, developed SOPs for PP plant for client operators to follow safe operation during start up and normal running
Coordinated with various discipline for identifying hazards and dark areas in plant during design, construction, commissioning and suggested points to counter them at early stage under Plant Readiness Program
Handled various proposal work for new Gas, Polymer, Power projects and assessing cost of pre-commissioning and Commissioning work
From April 2011 to May 2012 handled pre-commissioning work for TEA (Co-catalyst for PP) project (170 Mn $) at Al-Jubail, Saudi Arabia, as commissioning manager
Lead commissioning team for safe and successful execution of activities
Attended Hazop study, ENVID study, 30, 60 & 90% 3D model review for the project
I was involved in this project from its proposal stage
April 2007-Mar 2008
Company: Advance Polymers, Saudi Arabia
Position: Commissioning Team Member
Project: Novolene PP Plant
Nature of Work
Confirming mechanical completion of PP Plant
Pre commissioning, Commissioning and safe Startup of PP Plant of 320000 MT
Suggested modifications for making process better and safe
Running Normal Day to day activities of plant
Oct 1981-Mar 2007
Company: I.P.C.L. (Now Reliance), India
Position: Various positions
PP PLANT- Reliance (IPCL) Baroda
Licensor: Basell Italy
Nature of Work
Confirming mechanical completion of PP Plant
Pre commissioning, Commissioning and safe Startup of PP Plant of 110000 MT
Suggested modifications for making process better and safe
Running Normal Day to day activities of plant
PP Plant (Haldia)
Licensor: Basell Italy
Nature of Work
Worked as Commissioning Expert along with Licenser Team.
Trained Company staff for safe operation
Later, helped them operating the plant for few months
Suggested modifications for trouble shooting issues in plant
Liquid and Gas product handling system
Nature of Work
Almost its entire liquid and gas product of IPCL is stored & dispatched from here
I was in charge of the division
I managed and lead a team of operators, technicians to store, load, unload, dispatch, drum feeling, Railway rack feeling, maintain various activities for the products like Ethylene, Propylene, C4 Raffinate, Toluene, Hexane, Heptane, Fuel oil, Xylenes, LAB, Solvent C9 etc.
Acrylates Plants
Nature of Work
Handled Pre commissioning, Commissioning of Methyl Ethyl, 2-Ethyle hexyls and Butyl acrylates
After commissioning handled 4 Acrylates plants successfully For 9 years
Handled esterification, amide formation and purification for day to day operation
Acrylonitrile Plants
Nature of Work
For 2 years handled operating Acrylonitrile plant successfully
During working at Acrylonitrile plant, I handled various distillation Columns, pumps, reactor, rotary compressor, refrigeration unit etc.
Participation / Training:
Licensor training by Novolene, at Al-Jubail ,KSA for One week
On plant training for Panel & Filed Operations and Quality Procedures by Novolene in SPC, at Al-Jubail, KSA for Two weeks.
Fire Fighting training at General Authority of Civil Aviation at Jeddah, Saudi Arabia
Various Fire & Safety trainings at IPCL
In-house training for firefighting, SCBA use, Confined Space Entry
Training for Plant Safety and Safety hazards in Petrochemical industry
Personal Details.
Name: Narendra Mistry
Education: Petrochemical Engr
Email: nv_mistry@yahoo.com
Ph: +91-9998976876
DOB: 15th Sept. 1961
Share
Facebook
X
LinkedIn
Telegram
Tumblr
Whatsapp
VK
Mail