Site logo
Pakistan
Member Since 2024

About the Candidate

NOWSHERWAN MAZARI
MOQ # 11, Fatima Fertilizer Company Limited, Sadiqabad, Pakistan.
􀂶 +923458068281 􀃦 nowsherwanmazari@gmail.com 􀁅 https://www.linkedin.com/in/nowsherwan-mazari
Summary
Mechanical Engineer with experience in Power and Fertilizer industry. Skilled in Maintenance (rotary/static), Inspection, Project
Engineering, Planning and Services Contracting.
Work Experience
Fatima Fertilizer Company Limited Jun 2022 – Present
Planning & Contracts Engineer Sadiqabad, Pakistan
Planned and monitored plant maintenance, turnaround, and shutdown activities using Primavera P6 and Oracle/SAP ERP, ensuring timely
execution and operational efficiency
Procured necessary services for the site, ensuring compliance with legal, HSE, Process Safety Management (PSM), Contractor Safety
Management (CSM) and company policies, which resulted in uninterrupted project progress
Developed and implemented contracting strategies with stakeholders, ensuring contract execution aligned with company, HSE, and legal
policies, leading to successful project outcomes
Prepared and issued bid documentation, including scope of work, schedule, and technical requirements, which facilitated clear
communication and successful contract awards
Negotiated agreements and contracts for services, achieving favorable terms that supported project cost-effectiveness and efficiency
FFBL Power Company Limited Feb 2021 – May 2022
Project Engineer (Mechanical) Karachi, Pakistan
Developed and issued IFC Modification Packages and Drawings to meet process and safety requirements, ensuring compliance and
enhancing project safety
Conducted stress and flexibility analysis of high temperature and pressure power piping according to ASME B31.1, ensuring system
reliability and safety
Designed and upgraded mechanical components like pressure vessels, heat exchangers, storage tanks, and expansion bellows using ASME
Section VIII, Div.-1, TEMA, and API codes, improving efficiency and compliance
Designed and evaluated new steel structural systems using STAAD Pro, enhancing structural integrity and project feasibility
Prepared WPS/PQR and Inspection Test Plans, ensuring quality control and adherence to project specifications
Scanned spare parts in 3D using FaroArm Blue Laser Technology and developed drawings using Polyworks, PTC Creo, and AutoCAD as
per ASME Y14.5, improving the accuracy and efficiency of part reproduction
FFBL Power Company Limited May 2017 – Feb 2021
Mechanical Maintenance Engineer Karachi, Pakistan
Executed routine maintenance jobs on machinery and equipment using SAP & Oracle ERP, ensuring optimal performance and reducing
downtime
Executed new and modification projects using Autodesk Auto CAD and PTC Creo, enhancing system efficiency and meeting project
deadlines
Maintained spare parts inventory using Oracle ERP, ensuring availability and reducing equipment downtime
Prepared detailed work instructions and procedures, improving team efficiency and ensuring compliance with safety standards
Conducted Job Safety Analysis (JSA) for major jobs, identifying potential hazards and implementing safety measures to prevent accidents
Managed resources and planned the execution of TA/SD jobs, ensuring timely completion and efficient use of materials
Utilized SAP for inventory management, procurement, job planning, and budgeting, leading to improved operational efficiency
Gained experience with GE Steam Turbines, CFB Boilers, Solid Handling, BOP, and Cooling Tower, contributing to enhanced system
reliability and performance
Education
University of Engineering & Technology (UET), Taxila, Pakistan
Bachelors, Mechanical Engineering
FFC Grammar H/S School, Goth Machhi
CIE GCE A LEVELS
Achievements: A* A B
FFC Grammar H/S School, Goth Machhi
CIE GCE O LEVELS
Achievements: A*A*A*A*A A B
Certifications
Ultrasonic Testing Level – 01: Registration No.: UT1-740, 2021 – NCNDT, Islamabad, Pakistan
Ultrasonic Testing Level – 02: Registration No.: UT2-218, 2021 – NCNDT, Islamabad, Pakistan
Skills
MS OFFICE, Autodesk Auto CAD, PTC Creo, SAP & Oracle ERP, Primavera P6 / MS Project, Staad Pro, Caesar II, Project Management,
Contractor Management, Machinery Maintenance, Equipment Maintenance, Services Contracting, Negotiation, Project Engineering,
Conflict Management, SAP, ERP Systems, Contract Engineering
Projects
Project Engineer (Mechanical) Feb 2021 – May 2022
Development and issuance of IFC Modification Packages / Drawings as per Process / Safety Requirements.
Stress/flexibility analysis of high temperature/pressure power piping as per ASME B31.1.
Mechanical design/up rate of Pressure Vessels, Heat Exchangers, Storage Tanks & Expansion Bellows based on ASME Section VIII,
Div.-1 , TEMA & APIs codes
Steel Structure design and evaluation of new structural System using STAAD Pro.
Preparation of WPS/PQR along with Inspection Test Plan
3D scanning of spare parts using FaroArm Blue Laser Technology. Drawing development of spare parts using Polyworks, PTC Creo and
AutoCAD as per ASME Y14.5.
Fatima Fertilizer Company Ltd. Projects
Planning & Contracting of major jobs in TA-23, TA-24 with resulted savings 250 Million.
Launch of E-Bidding, I-invoicing for paperless, transparent and efficient processing of bids, invoices and orders issuance.
Automation of further 06 projects in services procurement saving 90 Mandays / year.
Launch of RFID + Biometric attendance system for manpower pool of 14,000+ people.
Launch of DMS system for digitization of 30,000+ P&C documents.
FFBL Power Company Ltd. Projects
Engineering and Installation of new 30 m3 Sodium Hypochlorite Storage Tank at Cooling Tower.
ATA-2022: CFB Boilers Furnace Tube Distortion measurement and mapping.
ATA-2021: CFB Boilers Refractory replacement – Hot Cyclones Inner Walls.
ATA-2020: CFB Boilers Refractory Replacement – Hot Cyclones Outer Walls.
ATA-2019: Replacement of Reclaimer Winch Hoist Wire Rope.
ATA-2019: Thermal Protective Coating (HVTS Coating) for CFB Boiler Furnace Water Wall Tubes.
Construction & Installation of Diesel Oil Dispensing Unit (FPCL Fuel Station).
Bearings, Condenser, Flashtank Inspection & MLO Pump Installation of 60 MW Turbine in Shutdown Sept-2018.

Print Resume

Sign in

Sign Up

Forgot Password

Cart

Cart

Share