Site logo
Faisalabad, Faisalabad District, Faisalabad Division, Punjab, Pakistan
Member Since 2024

About the Candidate

Dynamic Electrical Engineer with 9 years of diverse experience, including 5 years in high voltage systems, transmission, and equipment testing, and 4 years in avionics, specializing in Engine Control Units (ECU) and systems integration. Strong project management skills with a proven ability to lead complex projects, drive innovation, and deliver high-impact solutions in fast-paced, high-stakes environments.

Education

September 2017 - June 2019
Saint Petersburg Polytechnic University Masters in Electrical and Power Engineering
September 2007 - June 2010
Cardiff University Bachelors in Electrical and Electronic Engineering

Experience

November 2020- Currently Working
ADIC, NASTP Senior Design Engineer

Main Responsibilities and achievements:
● Led avionics systems integration for micro jet engines
● Modified hardware and firmware for jet Engine Control Units (ECU)
● Authored Interface Control Documents (ICD) for avionics systems
● Developed functional requirements for the subsystem, ensuring alignment with project specifications.
● Designed circuits and simulated PCB schematics using Altium Designer, ensuring optimized layout and functionality
● Conducted power distribution analysis for a lighter aircraft.
● Contributed to civil certification of a lighter aircraft.

September 2019 - August 2020
Chaudhary Industries Electrical Engineer

Main Responsibilities and achievements:
● Managed projects involving the conversion of 3-phase machines to inverters, variable frequency drives, and AC servos for industrial applications.

September 2016 - August 2017
Chaudhary Industries Electrical Engineer

Main Responsibilities and achievements:
● Optimized and aligned electrical instrumentation and testing equipment for enhanced performance.
● Tested electrical products and systems to evaluate the effectiveness of modifications.

July 2014 - August 2016
Sitara Chemicals Industries Ltd Electrical Engineer

Main Responsibilities and achievements:
● Performed in-depth electrical acceptance testing of completed hardware, including continuity and high-potential isolation testing.
● Calculated daily plant load and analyzed monthly consumption of total kWh units as Grid In-Charge.
● Laid new underground power cables for the plant which minimized the earth- fault and increased the plant production by 20 percent.
● Managed engineering changes using SAP systems.

Skills
Altium DesignInterpersonal Communication SkillsMATLAB/SimulinkMS officePrimavera P6Project management
Print Resume

Sign in

Sign Up

Forgot Password

Cart

Cart

Share