About the Candidate
SUSHANT SHEGAONKAR
Email: sushant.shegaonkar01@gmail.com Passport Number: Y6497176, Skype ID: svs.sushant07
Mobile: +91-8305280977
Objective:
To manage and supervise execution of the assigned domain for a project in line with overall project plan and requirement of user as per organizational guidelines and internal / statutory requirements to ensure completion of assigned domain/ package as per performance parameters of time, cost and quality.
Mechanical Engineer over 21 years’ experience in Erection & Commissioning of Thermal Power Project in field of WFGD, ESP, Boiler package, Piping, TG Auxiliary and Ducting.
Milestone Achieved:
Successful completion of erection and COD of 2×660 MW, WFGD Project for NTPC Tanda, Uttar Pradesh.
Successful completion of erection and COD of 2×660 MW, WFGD Project for Hindustan Power Project ( Mosurbare), Thermal Power Project, Anuppur, Madhya Pradesh.
Successful completion of erection and COD of 2×660 MW, Boiler for NTPC Solapur in record time. (After hydro hydrotest to COD only 211 days
Successful completion of Erection and COD of 2×600 MW, Boiler for Hindustan Power Project ( Mosurbare), Thermal Power Project, Anuppur, Madhya Pradesh.
Successful Completion of erection and record hydro test of2x300 MW in 5month 16 days after celling girder erection, Boiler for Rosa Thermal Power Project (RTPP) at Rosa, Shahjahanpur, (U.P.).
Successful Completion of Erection and COD of ESP and Duct 2×300 MW for Dinbandhu Dinanath Thermal Power Project, Yamunanagar, Haryana.
Professional Experience:
GE Power India Ltd. ( April08,2024- Till date )
Working as a Construction Manager Mechanical for 2×660 MW, WFGD Project NTPC Tanda, UP
Job Responsibility:
Lead the Mechanical team for erection and execution of WFGD.( Absorber, Storage tanks, Piping Ducting, pipe rack, equipment’s and HVAC Duct)
Responsible to manage the quality, budget and schedule for the Mechanical package assigned to during the execution of the Project from take-over to hand-over.
Checking off and promulgation of erection documentation to subordinate personnel.
Creation of a detailed plan and sub schedule to ensure all works for mechanical completed in accordance with the overall schedule.
Preparation and pre checks to ensure all materials are available and all required tools and equipment are available (applies to both subcontracting and Self Performance environments)
Actively manage/support all subordinate personnel, subcontractors and/or Self Performance erection forces to optimise the execution of Mechanical package.
Communicate directly with superiors and engineering to resolve and/or clarify any technical issues.
Coordination with the Overall Construction Manager and other discipline construction leads on all issues affecting the Mechanical package works and interfaces with other works.
Ensure the scope of contractor and execute the project as per L2 Schedule.
Review of L2 Schedule and arrange the resources as per requirement from contractor as well as client side.
Ensure the safe work at site by attending TBT and safety meeting.
Ensure the quality at site as per FQP.
Apollo International Ltd. (Dec05,2022 – 29.03.2024)
Working as a Manager Mechanical for 2×600 MW, WFGD Project Hindustan Thermal Power Plant, (MBPPL) Laherpur, Anuppur, Madhya Pradesh.
Job Responsibility:
Reporting to RCM for Erection and execution of 2×600 MW, WFGD .( Absorber, Storage tanks, Piping Ducting, pipe rack, equipment’s,)
Ensure the scope of contractor and execute the project as per L2 Schedule.
Prepare and review of L2 Schedule and arrange the resources as per requirement from contractor as well as client side.
Coordinate with client, Internal department and contractor for smooth progress at site for completion of project.
Arrange client and contractor meeting for avoid distortion, bottleneck of project to meet the set target of week, month and availability of all the resources including manpower to carry out the work done.
Prepare three month rolling plan for erection and cash flow at site.
Ensure the safe work at site by attending TBT and safety meeting.
Ensure the quality at site as per FQP.
Simar Infrastructure Ltd. (May 22,2022 – Nov 30,2022)
Working as a Project Manager for 2×660 MW, WFGD Project OPGCL, IB Thermal Power Plant,Telanpali, Jharsugada, Orisa.
Job Responsibility:
Reporting to CMD for Erection and execution of 2×660 MW, WFGD .( Absorber, Storage tanks, Piping Ducting, pipe rack, equipment’s,)
Coordinate internal resources and third parties/vendors for the flawless execution of projects.
Ensure that all projects are delivered on-time, within scope and within budget
Assist in the definition of project scope and objectives, involving all relevant stakeholders and ensuring technical feasibility.
Ensure resource availability and allocation.
Develop a detailed project plan to monitor and track progress.
Manage changes to the project scope, project schedule and project costs using appropriate verification techniques.
Develop comprehensive project plans to be shared with clients as well as other staff members
Use and continually develop leadership skills
Attend conferences and training as required to maintain proficiency
Perform other related duties as assigned by management.
BGR Energy System (Nov 16, 2017 – Sept 10,2021)
Worked as a Manager Site Mechanical for 2×660 MW, NTPC Hotgi,TPP.in Field of Boiler Pressure part.
Job Responsibility:
Reporting to AVP Mechanical for erection and alignment of Boiler package Unit #2.
Erection, Alignment & Welding of Boiler Pressure parts, LP Piping, Structure and Duct & Insulation.
Maintain the erection schedule. Track the erection work as per the schedule suggest course connection to bring back the schedule on track.
Manpower and resource planning to meet the erection schedule.
Coordinate with customer as well H.O. regarding the work progress.
Review weekly & monthly reports of package assigned, escalate issues and drive corrective actions.
Responsibilities of erection engineers to describe at site.
Ensure implementation of construction QA/ QC processes and safe working culture.
Attend Site Meetings with clients and contractor.
Forecast the amount of work to executed and hence plan the cash flows at site.
LANCO INFRATECH LTD (Feb 16,2010 – Oct 29,2017)
Worked as an Assistant Manager for 2×660 MW Amarkantak thermal power project, Korba , Chhattisgarh.
Job Responsibility:
Erection, Alignment & billing of Boiler Pressure parts, Piping ,Coal Piping, Structure, TG Auxiliary Equipment, ESP and Duct
Responsible for day to day site work of domain engineering as per scheduled plan.
Ensure safety and quality
Experience in attending boiler tube leakage (BTL) of all the areas with least possible time.
Coal nozzle maintenance and reconditioning of old coal nozzle at site.
Large rating safety valve maintenance and its Pressure/ Blow down setting.
Wall blowers and long retractable soot blowers Preventive and breakdown maintenance.
Adaptation of best maintenance practice to reduce the breakdown maintenance.
Review of Basic/Detailed Engineering drawings for Boiler which includes Plant Layout, P&IDs, GA Drawings, Piping Layout, and System Description.
Day to day defects attending for boiler.
Implementation of PM module for various Pressure Parts and Wall blowers of Boiler.
Co-ordination with sub-contractors, supplier, transporters/shippers & various departments within plant for any technical as well as commercial query and to ensure timely completion/executions of project/contract.
Petron Engineering Construction Limited. (May 29, 2008 to Feb 14, 2010).
Leading Construction Company in Power plant and Oil gas,Worked as a Fabrication and Erection Engineer
Job Responsibility:
Erection, Alignment & Welding of Boiler Pressure Parts, Piping at Rosa Site.
Erection, Alignment & Welding of Air Gas Ducting at Rosa Site.
Ensure implementation of construction QA/ QC processes, making protocols at Rosa Site.
Co-ordinate Site contractor for correct Installation and timely Complete the Task at Rosa Site.
Ensure the Safety and quality.
Mobilization of Site and contractor at Tiroda Site.
Erection and Alignment of Boiler Structure at Tiroda Site.
Attend daily site Meeting with clients and contractors.
Sunil HiTech Engineers Ltd. (OCT 20, 2006- APR 20, 2008).
2X300 MW Deenbandhu Dinanath Chhoturam Thermal Power Project (Reliance Infrastructure) at Yamuna Nagar, Haryana
Job Responsibility:
Planning, Erection, Alignment & Welding of ESP (Electrostatic Precipitator).
Planning, Erection, Alignment & Welding of Flue Gas Ducting.
Site Billing and contractor billing.
Making Protocols and records of document.
Co-ordinate labour / manpower resources to meet program critical dates.
Ensure the adherence to safety and Quality Standards.
Ensure implementation of construction QA/ QC processes.
Grind well Nortan Ltd. MIDC, Butibori, Dist-Nagpur, Maharashtra. (Oct20, 2004 – Sept19, 2005).
Leading Manufacturer & Exporter of Abrasives & Silicon Carbide
Worked as a Production Engineer
Job Responsibility:
Manpower planning for the Schedule task.
Power Press Planning and Programming.
Maintenance of Power Press.
Maintain Dispatched list of Product.
RasayantrikUdyog,Industrial Area ,Chandrapur ,Maharashtra (June 01, 2003 to May30, 2004)
Fabrication and Manufacturing of Tank and Pipes for power plant and cement plants
Worked as a Production Engineer
Job Responsibility:
Manpower Planning for Fabrication & Welding task of Tank, Shielding, Pipe and Sleeves.
Monitoring of Incoming and Outgoing Material.
Generating & maintain reports for new task.
Costing of Product for Fabrication.
Give instruction to Worker for Fabrication and Bottleneck Of drawing.
Trainings
Power Plant Familiarization, NTPC PMI-NOIDA
Safety at Construction site, NSC e-learning Kolkata
Educational Qualification:
BE Mechanical from Institute of Mechanical Engineering, Mumbai in 2013
Diploma in Mechanical Engineering from Govt. Polytechnic College, Bramhapuri, Chandrapur in 2003.
HSC from LokamayaTilakJr.College ,Bramhapuri, Dist: Chandrapur in 1998.
SSC from LokmanyaTilakVidyalaya, Bramhapuari,Dist : Chandrapur in 1996.
Personal Information:
Father’s Name : Shri Vasant Shegaonkar
Date of Birth : July 12, 1980
Languages Known : English, Hindi, and Marathi
Marital Status : Married
Permanent Address : Anchaleshwar Ward,
Near Shiwaji Square, Chandrapur-442402
Maharashtra
Declaration:
I, hereby solemnly declare that all the statements made in the above are true and correct to the best of my knowledge and belief.
Sushant Vasant Shegaonkar
Share
Facebook
X
LinkedIn
Telegram
Tumblr
Whatsapp
VK
Mail