About the Candidate
Competent electrical engineer with more than 14 years of combined site supervision & electrical services design experience in the construction field of large-scale projects through all the projects phases starting from project early deliverables until handing over including T & C of dry utilities.
Hands-on experience in reviewing schedules, drawing submittal, technical material submittal, MS & ITP, T & C documents, operation manual of MV, LV, ELV & ICT systems.
Familiar with electrical international and local standards & codes such as; IEC, NEC, BS, NFPA, ANZS, SBC.
Expertise in FAT & SAT of Transformer, MV Switchgear, RMU, LV switchgear, ATS, UPS, MV/LV Cables, and other electrical equipment’s.
· Design, drawing & Material submittal review of ELP System, MV & LV network, Containment, Power System, Lighting System.
· Review of design / shop drawing along with technical material submittal of Fire Alarm system, GRMS, Lighting Control System (DALI), Emergency Lighting System, CBS, UPS, BMS, Structured Cabling, Security System (CCTV & Access), Data / Telephone System, IPTV System, Master Clock System, Intrusion Detection System, Queuing System.
· Techno commercial meeting with Clients, Contractor & Supplier to get the best possible solution as per the project baseline also maintaining the Guaranteed technical points of the project specification.
· Site MEP Works & Coordination (BIM)
· Testing & Commissioning
· Infrastructure Works – Dry Utilities
· Contracts Management
Sr. Electrical Engineer
Nationality / Languages
Indian / English, Hindi, Bengali, Arabic, Marathi
Qualifications
Bachelor’s degree – Bachelor of Technology in Electrical Engineering
Professional associations
Saudi Council of Engineers Reg No – 166184
PROJECTS INVOLVED
· MISK – ATKINS – MISK Foundation is a non-profit organization devoted to cultivating and encourage learning and leadership in the youth for a better future in Saudi Arabia.
· Shura Island – Red Sea Global – ATKINS – 3000 Guest Room, 75 luxury Villa, Golf Club House, Golf Course, Infrastructure development of 25 Sq KM.
· SNB Tower – KAFD – 4B+G+40 Floor – High end fit out works.
· Riyadh Airport Emergency Evacuation Facility – 3 Emergency Hangers & Support facility of Emergency evacuation of Riyadh airport.
· New Zealand Embassy – Riyadh – Upgradation of system Voltage along with refurbishment & fit out of New Zealand Embassy in Riyadh.
· Yamama Palace – Riyadh – L01 – New Palace at Yamama Compound.
· KAP – Ministry of Interior – Security forces Training Centre along with Stadium and Infrastructure development of 12 Sq KM.
· Head Quarter Building – Ministry of Interior – MOI – Jeddah Headquarter – Highly secured & 100% electrical redundant system.
· ITCC Residential Phase – 80 Nos – B+G+6 Building, 102 Nos Villas, Schools, Gas Station, Swimming Pools & Dry Utilities Works.
Roles & Responsibilities:
Review & Approval:
• Design Drawing, Schematic design & shop drawing (IFC) to ensure that works will precede as per contract documents.
• Inspection reports (WIR, MIR) and records of quality control.
• Client’s deliverables and resolving issues (RFI) arose during interface between different contractors.
• Technical Material Submittal for electrical items and low current items as per project specification.
• Method Statements (MS), Inspection Test Plan (ITP) for construction activities before start of site works.
• Site Temporary power plan layout.
• Material, resource & manpower schedule of electrical works.
• Testing & Commissioning Plan along with method statement for required test to be carried out prior to energization of all electrical system.
Task Accomplished:
• Study all electrical contract drawings and documents compliance with applicable codes,
standards and regulations.
• Overseeing the production of shop drawings & details for LV systems (LTG, LTG CTRL, Small PWR, Power SLD, Earthing & Containments, Fire Alarm)
• Perform quantities take off for MV, LV & ELV systems by creating full and comprehensive list of all materials required for the project.
• Involved in the procurement stage by floating the quantities of electrical packages for LV
systems in the market and ensure all suppliers quotations comply with the specifications &
codes for the project like: Transformers (Schneider, 16 Nos, 1.6 -2.5 MVA, 13.8KV/400V – Dry & Oil Type) | Life Safety Generators (Cummins, 2 Nos, 1400 KVA) | MV Switchgears (Siemens, 18 Nos, 17.5 KV) | Internal Lighting Fixtures (Marelli, C-Luce, Fonseca, Disano, iGuzzini, Philips,Osram,13400 Nos) | Cable Tray, Trunking, Ladder & Fittings, Isolator, Wiring Accessories (Legrand, 7900 Nos) | Cable Gland & Lugs (HEX, 7000 Nos & 21000 Nos) | U-PVC Duct, Conduits & Fittings, PVC & GI (Deco duct , Burn) | Lightning Protection & Earthing System (Wallis) | MDB (ABB, 40 Nos)| SDB (ABB, 75 Nos) | PDB(ABB, 350 Nos) | MCC (ABB, 30 Nos) | Capacitors Bank (ABB, 17 Nos) | Busbars (EAE, 2705 m) | 11 KV Cable & FO Cable Fire Rated Cables(Prysmain,FP100,FP200 & FP600) | LV power & Earthing Cables ,MICC Cables.
• Update the management on weekly basis site progress and needs (material, drawings, manpower) by attending the weekly Progress, coordination & technical meetings.
Site Management / Coordination
• Overseeing site organization with a multi-discipline project and responsible for smooth flow
of the project within Quality, Cost & Time.
• In-charge of installation of Electrical & ELV services to be embedded in concrete elements
(Slabs, Columns, Wall & Retaining Walls…).
• In-charge of installation of Electrical & ELV services for, external works (Infrastructure
Works, Utility Buildings and Auxiliary Buildings – Pumping Station S/S & Potable Water
Pumping Station).
• Acting as work front leader for electrical scope by leading a team of different trades and crafts 200 person during the peak.
• Ensured that all installations comply with Specification, and material submittal & update
technical team for any changes in order to be revised in the drawings due to site condition.
• Monitor all kinds of construction activities, identifying problems, recommend improvement,
modification, take immediate corrective action if required and prepare various progress reports.
• Review shop drawings for MV, LV & ELV systems for building & infrastructure works before
release it to the site, and liaise with technical team in case of any discrepancies with other
services & lack of details to prevent any rework in the future.
• Liaise with the technical team to get the latest approved materials, shop drawings.
• Overseeing 1st, 2nd & 3rd fix installation of in –house & subcontractors works for:
LV Systems: Lighting, Lighting Control, Small Power, Containments, Earthing & LPS.
ELV Systems: ICT, PAVA, ACS, FAS, BMS, CCTV & DTA.
• Infrastructure Works: (Telecommunication Networks, ELV Networks, Dry Utilities, 13.8KV
Cable & Street Lighting).
• Transformers, Switchgears, MDB, SDB, PDB, MCC, ATS, CBS Installation, T &C.
• Follow up on daily progress on the site and ensure all teams are achieving the required target for each activity.
• Perform inspection for completed task and liaison with consultant & Quality Control team to
get the required approval.
• Liaise with all parties in the project for operation of the work (Technical, Civil, Planning,
Logistic, Architect …)
• Liaise with technical team for any coring/opening/penetration required on site, which does
not reflect on the BW.
• Overseeing the selection & requisition of materials.
• Identify types of the Ceiling, Wall & Floor finishes & liaise with civil team to get
clearance for the area and start installation of electrical services.
Planning / Scheduling
• Preparation of overall plan for execution & liaised with management on program preparation and resource allocation.
• Plans, Organizes, assigns the work, and reviews, evaluates the performance of assigned staff.
• Preparation of look ahead per system & update the management for weekly progress & site needs (material, dwgs, manpower).
• Establish & control of KPI program for the work front.
• Identify overall manpower (forecasting), gain/loss indicators for hours & QTY’s per week, actual & planned progress (cumulative) of quantities and hours
SOFTWARE USED
· PMIS – Aconex, Collab
· Material Management – SAP, Oracle
· Design – AutoCAD, Eco dial, Dialux, BIM 360
Share
Facebook
X
LinkedIn
Telegram
Tumblr
Whatsapp
VK